❓ A WA parliamentary question on notice requesting information on the number, details, commencement, and completion dates of reviews, committees, inquiries, and taskforces established within the Deputy Premier's portfolio since the election of the State Labor Government.
AnsweredQoN 1628Legislative Assembly
QuestionView source ↗
(1) Since the election of the State Labor Government how many reviews, committees, inquiries and taskforces have been established in the Deputy Premier’s portfolio?
(2) Will the Deputy Premier list the reviews, committees, inquiries and taskforces that have been established?
(3) Will the Deputy Premier list the commencement date and the completion date for each review, committee, inquiry and taskforce?
(2) Will the Deputy Premier list the reviews, committees, inquiries and taskforces that have been established?
(3) Will the Deputy Premier list the commencement date and the completion date for each review, committee, inquiry and taskforce?
AnswerView source ↗
Answered
11 June 2002
Response time
90 days
Department of Treasury and Finance (1) Four (2) (a) Review of Commonwealth State Funding (b) Review of State Business Taxes (c) Consultative Group on Payroll Tax and Contractors (d) Economic Regulator Implementation Committee. (3) (a) 30 November 2001 and 31 May 2002 (b) 13 September 2001 and 28 February 2002 (c) 13 September 2001 and 22 February 2002 (d) 21 August 2001. The Committee will continue meeting until final decisions are taken with respect to the implementation of the Economic Regulation Authority WA Treasury Corporation (1) Nil (2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(1) Four (2) (a) Review of Commonwealth State Funding (b) Review of State Business Taxes (c) Consultative Group on Payroll Tax and Contractors (d) Economic Regulator Implementation Committee. (3) (a) 30 November 2001 and 31 May 2002 (b) 13 September 2001 and 28 February 2002 (c) 13 September 2001 and 22 February 2002 (d) 21 August 2001. The Committee will continue meeting until final decisions are taken with respect to the implementation of the Economic Regulation Authority WA Treasury Corporation (1) Nil (2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(2) (a) Review of Commonwealth State Funding (b) Review of State Business Taxes (c) Consultative Group on Payroll Tax and Contractors (d) Economic Regulator Implementation Committee. (3) (a) 30 November 2001 and 31 May 2002 (b) 13 September 2001 and 28 February 2002 (c) 13 September 2001 and 22 February 2002 (d) 21 August 2001. The Committee will continue meeting until final decisions are taken with respect to the implementation of the Economic Regulation Authority WA Treasury Corporation (1) Nil (2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(3) (a) 30 November 2001 and 31 May 2002 (b) 13 September 2001 and 28 February 2002 (c) 13 September 2001 and 22 February 2002 (d) 21 August 2001. The Committee will continue meeting until final decisions are taken with respect to the implementation of the Economic Regulation Authority WA Treasury Corporation (1) Nil (2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
WA Treasury Corporation (1) Nil (2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(1) Nil (2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
Western Power Corporation (1)-(3) Not applicable
(1)-(3) Not applicable
(1) Four (2) (a) Review of Commonwealth State Funding (b) Review of State Business Taxes (c) Consultative Group on Payroll Tax and Contractors (d) Economic Regulator Implementation Committee. (3) (a) 30 November 2001 and 31 May 2002 (b) 13 September 2001 and 28 February 2002 (c) 13 September 2001 and 22 February 2002 (d) 21 August 2001. The Committee will continue meeting until final decisions are taken with respect to the implementation of the Economic Regulation Authority WA Treasury Corporation (1) Nil (2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(2) (a) Review of Commonwealth State Funding (b) Review of State Business Taxes (c) Consultative Group on Payroll Tax and Contractors (d) Economic Regulator Implementation Committee. (3) (a) 30 November 2001 and 31 May 2002 (b) 13 September 2001 and 28 February 2002 (c) 13 September 2001 and 22 February 2002 (d) 21 August 2001. The Committee will continue meeting until final decisions are taken with respect to the implementation of the Economic Regulation Authority WA Treasury Corporation (1) Nil (2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(3) (a) 30 November 2001 and 31 May 2002 (b) 13 September 2001 and 28 February 2002 (c) 13 September 2001 and 22 February 2002 (d) 21 August 2001. The Committee will continue meeting until final decisions are taken with respect to the implementation of the Economic Regulation Authority WA Treasury Corporation (1) Nil (2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
WA Treasury Corporation (1) Nil (2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(1) Nil (2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(2)-(3) Not applicable Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
Office of the Auditor General (1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(1)-(3) Not applicable Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
Energy International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
International Centre for Application of Solar Energy (1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(1)-(2) A taskforce has been established to review transition options for CASE, in particular, outsourcing of commercial activities (3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(3) Commencement date December 2001. Completion date May 2002. Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
Office of Gas Access Regulation (1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(1) Nil (2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(2) Not applicable (3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(3) Not applicable Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
Office of Energy (1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(1) 3 (2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(2) (a) Aboriginal and Remote Communities Power Supply Project Reference Group (b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(b) Gas Retail Deregulation Steering Group (c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(c) Electricity Reform Task Force (3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(3) (a) 8 March 2001. Ongoing. (b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(b) 3 July 2001. Completion - committee to determine (c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
(c) First met 21 August 2001. Completion - end August 2002. Western Power Corporation (1)-(3) Not applicable
Western Power Corporation (1)-(3) Not applicable
(1)-(3) Not applicable
Explore WA Government Data
Search the full archive in the free dashboard, or query programmatically via API.
Explore more
Government Gazette
Appointments, regulatory notices, planning changes.
Hansard
Debates, questions, speeches and sentiment.
Tabled Papers
Reports and documents tabled in Parliament.
Committees
Committee profiles and recent reports.
Regulations
Subsidiary legislation with filters and summaries.
Bills
Proposed laws and parliamentary progress.
Acts
Current WA legislation and summaries.
Explanatory Memoranda
Bills with EMs (text/PDF) available.
Members
MP profiles, party breakdown and rankings.
Pollie Rankings
Data-driven rankings across 19 categories.
Amendment Chains
Track how schemes and regulations evolve over time.