The parliamentary question seeks specific dates and methods of physical examinations of the Pilbara Energy Pipeline by the Department of Mines and Petroleum in 2016. The answer refers to the operator's safety case and inspection program, deeming the specific details requested as 'not applicable'.

AnsweredQoN 5775Legislative Assembly
Asked
16 August 2016
Portfolio
Mines and Petroleum

QuestionView source ↗

During 2016, on what specific dates did inspectors from the Department of Mines and Petroleum physically examine the piping of the Pilbara Energy Pipeline, and: (a) on each of these occasions, what methods were used for these physical examinations (eg, x-ray examination, visual observation, spectral camera analysis, etc); and (b) what was the total length of pipe that was examined as part of these inspections?

AnswerView source ↗

Answered
19 September 2016
Responded by
Minister for Mines and Petroleum
Response time
34 days
Answer as at 16 August 2016:
The Pilbara Energy Pipeline is managed under the Petroleum Pipelines (Management of Safety of Pipeline Operations) Regulations 2010. Division 2 of the Regulations requires the pipeline operator to have a safety case in force for the pipeline operation.
The safety case for the Pilbara Energy Pipeline, which is a buried pipeline, requires the operator to have a defined physical program of work that addresses inspection and corrosion issues. This includes the coating and cathodic protection systems in place for buried pipelines during its considered lifetime of operation. The inspection program also includes the agreed routine of inspection and reporting to the Department of Mines and Petroleum of the outcomes of these programs.
a) Not applicable.
b) Not applicable.

Explore WA Government Data

Search the full archive in the free dashboard, or query programmatically via API.

Explore more