Hon Robin Chapple questions the Department of Minerals and Energy regarding mine site rehabilitation at Mt Pleasant and Cawse, focusing on a proposed alternative rehabilitation plan, environmental bonds, and discrepancies in rehabilitation standards.

AnsweredQoN 423Legislative Council
Asked
26 February 2002
Portfolio
State Development

QuestionView source ↗

I refer to a newspaper article titled ‘The Green Agenda’ which appeared in the
Golden Mail Newspaper
on page 2, Friday, December 14 2001 -
(1) Is it correct that little over a year ago the Mt Pleasant environmental superintendent trumpeted a new approach to mine site rehabilitation wherein, instead of spending $15 million to rehabilitate an 800 square km area, scarred with mining pits and waste dumps the money would be redirected into new industries on surrounding pastoral properties?
(2) If so, was this done with the written approval of the Department of Minerals and Energy and what were the specific reasons why this was approved by the Department?
(3) Are all the environmental bonds still intact on all of the Mt Pleasant gold and nickel tenements and also Cawse gold and nickel tenements?
(4) If not, why not?
(5) If yes to (3), what are the amounts for each specific tenement number that have environmental bonds?
(6) Is it correct that in terms of rehabilitation and environmental standards that one side of the lease boundary is brilliantly done and the other could be likened to a moonscape?
(7) If yes, how did the Department of Minerals and Energy allow this to happen?
(8) If no to (6), why not?

AnswerView source ↗

Answered
26 March 2002
Responded by
Parliamentary Secretary representing the Minister for State Development
Response time
28 days
1. The Department is aware that the Mt Pleasant environmental superintendent had proposed to spend $15 million on rehabilitation of areas outside of direct minesite disturbance. This proposal was never submitted to the Department for comment or assessment. 2. This proposal was never submitted to the Department for comment or assessment. Consequently, it has not been approved by the Department. 3. Yes 4. Not applicable 5. Cawse tenements: TENEMENT BOND M24/543 $ 350,000 L24/167 $ 50,000 M24/224 $ 86,000 M24/389 $ 188,000 M24/517 $ 642,000 M24/519 $ 831,000 M24/520 $ 41,000 M24/544 $1,722,000 M24/547 $ 2,000 M24/548 $ 10,000 $3,922,000 Mt Pleasant tenements: TENEMENT BOND G24/19 $ 10,000 G24/20 $ 10,000 G24/3 $ 10,000 G24/8 $ 7,000 G24/9 ZERO G24/705 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
2. This proposal was never submitted to the Department for comment or assessment. Consequently, it has not been approved by the Department. 3. Yes 4. Not applicable 5. Cawse tenements: TENEMENT BOND M24/543 $ 350,000 L24/167 $ 50,000 M24/224 $ 86,000 M24/389 $ 188,000 M24/517 $ 642,000 M24/519 $ 831,000 M24/520 $ 41,000 M24/544 $1,722,000 M24/547 $ 2,000 M24/548 $ 10,000 $3,922,000 Mt Pleasant tenements: TENEMENT BOND G24/19 $ 10,000 G24/20 $ 10,000 G24/3 $ 10,000 G24/8 $ 7,000 G24/9 ZERO G24/705 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
3. Yes 4. Not applicable 5. Cawse tenements: TENEMENT BOND M24/543 $ 350,000 L24/167 $ 50,000 M24/224 $ 86,000 M24/389 $ 188,000 M24/517 $ 642,000 M24/519 $ 831,000 M24/520 $ 41,000 M24/544 $1,722,000 M24/547 $ 2,000 M24/548 $ 10,000 $3,922,000 Mt Pleasant tenements: TENEMENT BOND G24/19 $ 10,000 G24/20 $ 10,000 G24/3 $ 10,000 G24/8 $ 7,000 G24/9 ZERO G24/705 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
4. Not applicable 5. Cawse tenements: TENEMENT BOND M24/543 $ 350,000 L24/167 $ 50,000 M24/224 $ 86,000 M24/389 $ 188,000 M24/517 $ 642,000 M24/519 $ 831,000 M24/520 $ 41,000 M24/544 $1,722,000 M24/547 $ 2,000 M24/548 $ 10,000 $3,922,000 Mt Pleasant tenements: TENEMENT BOND G24/19 $ 10,000 G24/20 $ 10,000 G24/3 $ 10,000 G24/8 $ 7,000 G24/9 ZERO G24/705 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
5. Cawse tenements: TENEMENT BOND M24/543 $ 350,000 L24/167 $ 50,000 M24/224 $ 86,000 M24/389 $ 188,000 M24/517 $ 642,000 M24/519 $ 831,000 M24/520 $ 41,000 M24/544 $1,722,000 M24/547 $ 2,000 M24/548 $ 10,000 $3,922,000 Mt Pleasant tenements: TENEMENT BOND G24/19 $ 10,000 G24/20 $ 10,000 G24/3 $ 10,000 G24/8 $ 7,000 G24/9 ZERO G24/705 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
TENEMENT BOND M24/543 $ 350,000 L24/167 $ 50,000 M24/224 $ 86,000 M24/389 $ 188,000 M24/517 $ 642,000 M24/519 $ 831,000 M24/520 $ 41,000 M24/544 $1,722,000 M24/547 $ 2,000 M24/548 $ 10,000 $3,922,000 Mt Pleasant tenements: TENEMENT BOND G24/19 $ 10,000 G24/20 $ 10,000 G24/3 $ 10,000 G24/8 $ 7,000 G24/9 ZERO G24/705 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
M24/543 $ 350,000 L24/167 $ 50,000 M24/224 $ 86,000 M24/389 $ 188,000 M24/517 $ 642,000 M24/519 $ 831,000 M24/520 $ 41,000 M24/544 $1,722,000 M24/547 $ 2,000 M24/548 $ 10,000 $3,922,000 Mt Pleasant tenements: TENEMENT BOND G24/19 $ 10,000 G24/20 $ 10,000 G24/3 $ 10,000 G24/8 $ 7,000 G24/9 ZERO G24/705 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
Mt Pleasant tenements: TENEMENT BOND G24/19 $ 10,000 G24/20 $ 10,000 G24/3 $ 10,000 G24/8 $ 7,000 G24/9 ZERO G24/705 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
TENEMENT BOND G24/19 $ 10,000 G24/20 $ 10,000 G24/3 $ 10,000 G24/8 $ 7,000 G24/9 ZERO G24/705 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
G24/19 $ 10,000 G24/20 $ 10,000 G24/3 $ 10,000 G24/8 $ 7,000 G24/9 ZERO G24/705 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
Mt Pleasant tenements: (Contd. ) TENEMENT BOND L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
TENEMENT BOND L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
L24/69 ZERO M16/106 $ 80,000 M16/188 $ 204,500 M16/27 $ 291,000 M16/29 $ 12,000 M16/44 $ 39,000 M16/45 $168,500 M16/48 $ 70,000 M16/58 ZERO M24/102 $ 6,000 M24/138 $ 94,000 M24/148 $ 3,000 M24/155 $357,000 G24/11 $ 20,000 G24/12 ZERO M24/165 ZERO M24/182 ZERO M24/187 $427,500 M24/193 $ 56,000 M24/194 $390,000 M24/205 $195,000 M24/223 ZERO M24/227 $ 26,000 M24/234 $1,161,000 M24/236 $ 68,000 M24/265 $ 95,000 M24/266 $ 40,500 M24/270 $ 66,000 M24/271 $ 31,000 M24/274 $ 5,000 M24/29 $1,303,000 M24/291 $ 15,000 M24/295 $ 5,000 M24/302 $ 48,000 M24/303 ZERO M24/304 $ 402,000 M24/363 ZERO M24/376 $ 17,000 M24/387 $ 50,000 M24/388 $ 33,000 M24/390 $ 47,000 M24/393 $ 43,000 M24/403 $ 3,000 M24/430 $ 55,000 M24/433 ZERO Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
Mt Pleasant tenements: (Contd. ) TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
TENEMENT BOND M24/494 $ 65,000 M24/616 $ 72,000 M24/79 ZERO M24/80 $ 45,000 M24/81 $ 190,000 M24/82 $ 271,000 L16/56 $ 12,000 L16/48 $ 6,000 TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
TOTAL: MT PLEASANT BONDS $ 6, 625,000 6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
6. No There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
There is a very high standard of rehabilitation at the Paddington Gold operations, while there are sections of mining disturbance at Mt Pleasant, which have not yet been completed to Departmental standards. Where areas have not been completed, higher rates of bond will remain in place until the required rehabilitation works are completed. Areas which are still to be rehabilitated are currently being assessed and reviewed by Paddington Gold Operations (now AurionGold Pty Ltd) who have taken over the Mt Pleasant tenements. Paddington are reviewing these tenements for future mining potential and decommissioning. 7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
7. Not applicable 8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.
8. While there are some areas of outstanding rehabilitation on the Mt Pleasant tenements, there is sufficient security (by way of Unconditional Performance Bonds) to ensure that any outstanding work is completed to Departmental requirements.