❓ Hon Murray Criddle asked the Treasurer about capital works projects in WA regions for 2006-07, including allocated amounts, total costs, and expected completion dates. The Treasurer provided funding details and a report but stated completion dates weren't centrally recorded.
AnsweredQoN 3682Legislative Council
QuestionView source ↗
(b) Goldfields Esperance Region; (c) Great Southern Region; (d) Kimberley Region; (e) Mid-West Region; (f) Peel Region; (g) Pilbara Region; (h) South West Region; and (i) Wheatbelt Region,
(c) Great Southern Region; (d) Kimberley Region; (e) Mid-West Region; (f) Peel Region; (g) Pilbara Region; (h) South West Region; and (i) Wheatbelt Region,
(d) Kimberley Region; (e) Mid-West Region; (f) Peel Region; (g) Pilbara Region; (h) South West Region; and (i) Wheatbelt Region,
(e) Mid-West Region; (f) Peel Region; (g) Pilbara Region; (h) South West Region; and (i) Wheatbelt Region,
(f) Peel Region; (g) Pilbara Region; (h) South West Region; and (i) Wheatbelt Region,
(g) Pilbara Region; (h) South West Region; and (i) Wheatbelt Region,
(h) South West Region; and (i) Wheatbelt Region,
(i) Wheatbelt Region,
(ii) amount allocated to each project in 2006-07; (iii) total cost of the Capital Works Project; and (iv) expected completion date?
(iii) total cost of the Capital Works Project; and (iv) expected completion date?
(iv) expected completion date?
(a) Gascoyne Region $22,569,000 (b) Goldfields Esperance Region $113,771,000 (c) Great Southern Region $60,047,000 (d) Kimberley Region $128,545,000 (e) Mid-West Region $58,557,000 (f) Peel Region $118,646,000 (g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(b) Goldfields Esperance Region $113,771,000 (c) Great Southern Region $60,047,000 (d) Kimberley Region $128,545,000 (e) Mid-West Region $58,557,000 (f) Peel Region $118,646,000 (g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(c) Great Southern Region $60,047,000 (d) Kimberley Region $128,545,000 (e) Mid-West Region $58,557,000 (f) Peel Region $118,646,000 (g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(d) Kimberley Region $128,545,000 (e) Mid-West Region $58,557,000 (f) Peel Region $118,646,000 (g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(e) Mid-West Region $58,557,000 (f) Peel Region $118,646,000 (g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(f) Peel Region $118,646,000 (g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
[see tabled paper no.]
(c) Great Southern Region; (d) Kimberley Region; (e) Mid-West Region; (f) Peel Region; (g) Pilbara Region; (h) South West Region; and (i) Wheatbelt Region,
(d) Kimberley Region; (e) Mid-West Region; (f) Peel Region; (g) Pilbara Region; (h) South West Region; and (i) Wheatbelt Region,
(e) Mid-West Region; (f) Peel Region; (g) Pilbara Region; (h) South West Region; and (i) Wheatbelt Region,
(f) Peel Region; (g) Pilbara Region; (h) South West Region; and (i) Wheatbelt Region,
(g) Pilbara Region; (h) South West Region; and (i) Wheatbelt Region,
(h) South West Region; and (i) Wheatbelt Region,
(i) Wheatbelt Region,
(ii) amount allocated to each project in 2006-07; (iii) total cost of the Capital Works Project; and (iv) expected completion date?
(iii) total cost of the Capital Works Project; and (iv) expected completion date?
(iv) expected completion date?
(a) Gascoyne Region $22,569,000 (b) Goldfields Esperance Region $113,771,000 (c) Great Southern Region $60,047,000 (d) Kimberley Region $128,545,000 (e) Mid-West Region $58,557,000 (f) Peel Region $118,646,000 (g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(b) Goldfields Esperance Region $113,771,000 (c) Great Southern Region $60,047,000 (d) Kimberley Region $128,545,000 (e) Mid-West Region $58,557,000 (f) Peel Region $118,646,000 (g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(c) Great Southern Region $60,047,000 (d) Kimberley Region $128,545,000 (e) Mid-West Region $58,557,000 (f) Peel Region $118,646,000 (g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(d) Kimberley Region $128,545,000 (e) Mid-West Region $58,557,000 (f) Peel Region $118,646,000 (g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(e) Mid-West Region $58,557,000 (f) Peel Region $118,646,000 (g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(f) Peel Region $118,646,000 (g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(g) Pilbara Region $136,447,000 (h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(h) South West Region $199,962,000 (i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(i) Wheatbelt Region $65,132,000 (2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(2) The attached Projects by Region Report provides: (i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(i) details on each attributable regional project funded in 2006-07; (ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(ii) the amount allocated to each attributable regional project in 2006-07; and (iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(iii) details on the estimated total cost of each of the regional 2006-07 Capital Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
Works Projects. (iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
(iv) It is not possible to provide the expected completion date for each regional project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
project as this information is not expressly collected and recorded centrally by the Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
Department of Treasury and Finance. This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance. [see tabled paper no.]
[see tabled paper no.]
AnswerView source ↗
Answered
22 August 2006
Responded by
Minister for Education and Training representing the Treasurer
Response time
62 days
(1)
(a) Gascoyne Region $22,569,000
(b) Goldfields Esperance Region $113,771,000
(c) Great Southern Region $60,047,000
(d) Kimberley Region $128,545,000
(e) Mid-West Region $58,557,000
(f) Peel Region $118,646,000
(g) Pilbara Region $136,447,000
(h) South West Region $199,962,000
(i) Wheatbelt Region $65,132,000
(2) The attached
Projects by Region Report
provides:
(i) details on each attributable regional project funded in 2006-07;
(ii) the amount allocated to each attributable regional project in 2006-07; and
(iii) details on the estimated total cost of each of the regional 2006-07 Capital
Works Projects.
(iv) It is not possible to provide the expected completion date for each regional
project as this information is not expressly collected and recorded centrally by the
Department of Treasury and Finance.
This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance.
[see tabled paper no.]
(a) Gascoyne Region $22,569,000
(b) Goldfields Esperance Region $113,771,000
(c) Great Southern Region $60,047,000
(d) Kimberley Region $128,545,000
(e) Mid-West Region $58,557,000
(f) Peel Region $118,646,000
(g) Pilbara Region $136,447,000
(h) South West Region $199,962,000
(i) Wheatbelt Region $65,132,000
(2) The attached
Projects by Region Report
provides:
(i) details on each attributable regional project funded in 2006-07;
(ii) the amount allocated to each attributable regional project in 2006-07; and
(iii) details on the estimated total cost of each of the regional 2006-07 Capital
Works Projects.
(iv) It is not possible to provide the expected completion date for each regional
project as this information is not expressly collected and recorded centrally by the
Department of Treasury and Finance.
This information does not include a large portion of the Capital Works Program that is not easily allocated to particular regions as it relates to matters with State wide significance.
[see tabled paper no.]
Explore WA Government Data
Search the full archive in the free dashboard, or query programmatically via API.
Explore more
Government Gazette
Appointments, regulatory notices, planning changes.
Hansard
Debates, questions, speeches and sentiment.
Tabled Papers
Reports and documents tabled in Parliament.
Committees
Committee profiles and recent reports.
Regulations
Subsidiary legislation with filters and summaries.
Bills
Proposed laws and parliamentary progress.
Acts
Current WA legislation and summaries.
Explanatory Memoranda
Bills with EMs (text/PDF) available.
Members
MP profiles, party breakdown and rankings.
Pollie Rankings
Data-driven rankings across 19 categories.
Amendment Chains
Track how schemes and regulations evolve over time.