❓ A WA parliamentary question seeks details on consultants employed for the Draft Forest Management Plan 2014-2023, including their names, terms of reference, engagement periods, and payments. The answer provides a list of consultants and details of their engagement.
AnsweredQoN 1006Legislative Assembly
QuestionView source ↗
I refer to the
Draft Forest Management Plan 2014–2023
, prepared by the Conservation Commission, through the former Department of Environment and Conservation, and ask:
(a) did the Conservation Commission employ consultants to submit advice on the
Draft Forest Management Plan 2014–2023
, and if yes, what are the names of the consulting firms/agents; and
(b) if applicable, what were the terms of reference, period of engagement and payment to each individual consultant/consultancy group?
Draft Forest Management Plan 2014–2023
, prepared by the Conservation Commission, through the former Department of Environment and Conservation, and ask:
(a) did the Conservation Commission employ consultants to submit advice on the
Draft Forest Management Plan 2014–2023
, and if yes, what are the names of the consulting firms/agents; and
(b) if applicable, what were the terms of reference, period of engagement and payment to each individual consultant/consultancy group?
AnswerView source ↗
Answered
10 September 2013
Responded by
Minister for Environment
Response time
35 days
· Astron Environmental Services · Gaia Resources · Joanna Young & Associates · Resolve Global · Tony Brandis Environmental Consultancy · Tuna Blue Pty Ltd · URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
· Gaia Resources · Joanna Young & Associates · Resolve Global · Tony Brandis Environmental Consultancy · Tuna Blue Pty Ltd · URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
· Joanna Young & Associates · Resolve Global · Tony Brandis Environmental Consultancy · Tuna Blue Pty Ltd · URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
· Resolve Global · Tony Brandis Environmental Consultancy · Tuna Blue Pty Ltd · URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
· Tony Brandis Environmental Consultancy · Tuna Blue Pty Ltd · URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
· Tuna Blue Pty Ltd · URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
· URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
(b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $139 880
· Gaia Resources · Joanna Young & Associates · Resolve Global · Tony Brandis Environmental Consultancy · Tuna Blue Pty Ltd · URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
· Joanna Young & Associates · Resolve Global · Tony Brandis Environmental Consultancy · Tuna Blue Pty Ltd · URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
· Resolve Global · Tony Brandis Environmental Consultancy · Tuna Blue Pty Ltd · URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
· Tony Brandis Environmental Consultancy · Tuna Blue Pty Ltd · URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
· Tuna Blue Pty Ltd · URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
· URS Australia Pty Ltd (b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
(b) Astron Environmental Services was engaged to provide advice on options for future key performance indicators in the areas of biodiversity and ecosystem health and vitality. Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: August to October 2012 Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $18 598 Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Gaia Resources was engaged to "Quantify some of the values and threats within the various Land Management Units across the forested area of the south-west of Western Australia and compare them against one another. This includes assessing the presence and prevalence of values and threats on aspects such as biodiversity, heritage, social use and resource use (such as forest production)". Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: December 2011 to February 2012 Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $33 479 Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Joanna Young & Associates was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues; Participate in the preparation of briefing papers for consideration by the Conservation Commission and; Advise on technical matters as required". Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: May 2011 to December 2012 Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $53 200 Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Resolve Global was engaged to "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan; Review and advise on forest management documentation and issues with particular emphasis on recreation and water management issues and; Participate in the preparation of briefing papers for consideration by the Conservation Commission". Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: October 2011 to April 2012 Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $14 322 Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Tony Brandis Environmental Consultancy was engaged by the Conservation Commission to: "Provide independent advice to staff and members of the Conservation Commission in the development of the Forest Management Plan". Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: April 2012 to March 2013 Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $15 860 Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Tuna Blue Pty Ltd was engaged as an experienced facilitator to assist at the information sessions and the structured briefings and to assist in preparation of, and report writing on, these sessions for the Draft Forest Management Plan 2014-2023 . Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: September to October 2012 Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $10 615 URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
URS Australia Pty Ltd was engaged to undertake a social and economic assessment of the Draft Forest Management Plan 2014-2023 . The report available on the Department of Parks and Wildlife website at: http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
http://www.dpaw.wa.gov.au/management/forests/59-preparing-the-forest-management-plan-2014-2023 Period of engagement: May to August 2012 Consultancy fee: $139 880
Period of engagement: May to August 2012 Consultancy fee: $139 880
Consultancy fee: $139 880
Explore WA Government Data
Search the full archive in the free dashboard, or query programmatically via API.
Explore more
Government Gazette
Appointments, regulatory notices, planning changes.
Hansard
Debates, questions, speeches and sentiment.
Tabled Papers
Reports and documents tabled in Parliament.
Committees
Committee profiles and recent reports.
Regulations
Subsidiary legislation with filters and summaries.
Bills
Proposed laws and parliamentary progress.
Acts
Current WA legislation and summaries.
Explanatory Memoranda
Bills with EMs (text/PDF) available.
Members
MP profiles, party breakdown and rankings.
Pollie Rankings
Data-driven rankings across 19 categories.
Amendment Chains
Track how schemes and regulations evolve over time.