❓ WA Parliament QoN 2058 requests details on land near rivers/estuaries awaiting infill sewerage and installation timelines. The Minister provides a breakdown by locality and planned construction year, noting developer timing dependencies and areas not included in the program.
AnsweredQoN 2058Legislative Council
Asked
19 May 2005
Member
Portfolio
Minister Assisting the Minister for Water Resources
QuestionView source ↗
Can the Minister detail all developed land close to rivers and estuaries in the metropolitan and Peel regions which is still waiting for infill sewerage, and the proposed timetable for installation?
AnswerView source ↗
Answered
21 June 2005
Responded by
Minister for Fisheries representing the Minister Assisting the Minister for Water Resources
Response time
33 days
The following locations within the Swan and Canning River catchments remain to be sewered under the Infill Sewerage Program. TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Bassendean 27 2005/06 Kelmscott 467 2004/05 & 2010/11 - 2011/12 Maida Vale 427 2004/05 - 2005/06 & 2007/08 Mosman Park 47 2005/06 Wilson/Waterford 262 2007/08 TOTAL 1,230 Maida Vale and Wilson/Waterford are subject to the developer's timing. 2) Peel/Harvey Region The following locations in the Peel/Harvey region remain to be sewered under the Infill Sewerage Program. TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Bassendean 27 2005/06 Kelmscott 467 2004/05 & 2010/11 - 2011/12 Maida Vale 427 2004/05 - 2005/06 & 2007/08 Mosman Park 47 2005/06 Wilson/Waterford 262 2007/08 TOTAL 1,230 Maida Vale and Wilson/Waterford are subject to the developer's timing. 2) Peel/Harvey Region The following locations in the Peel/Harvey region remain to be sewered under the Infill Sewerage Program. TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
LOCALITY
Bassendean 27 2005/06 Kelmscott 467 2004/05 & 2010/11 - 2011/12 Maida Vale 427 2004/05 - 2005/06 & 2007/08 Mosman Park 47 2005/06 Wilson/Waterford 262 2007/08 TOTAL 1,230 Maida Vale and Wilson/Waterford are subject to the developer's timing. 2) Peel/Harvey Region The following locations in the Peel/Harvey region remain to be sewered under the Infill Sewerage Program. TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
Maida Vale and Wilson/Waterford are subject to the developer's timing. 2) Peel/Harvey Region The following locations in the Peel/Harvey region remain to be sewered under the Infill Sewerage Program. TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
2) Peel/Harvey Region The following locations in the Peel/Harvey region remain to be sewered under the Infill Sewerage Program. TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
The following locations in the Peel/Harvey region remain to be sewered under the Infill Sewerage Program. TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
LOCALITY
In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Bassendean 27 2005/06 Kelmscott 467 2004/05 & 2010/11 - 2011/12 Maida Vale 427 2004/05 - 2005/06 & 2007/08 Mosman Park 47 2005/06 Wilson/Waterford 262 2007/08 TOTAL 1,230 Maida Vale and Wilson/Waterford are subject to the developer's timing. 2) Peel/Harvey Region The following locations in the Peel/Harvey region remain to be sewered under the Infill Sewerage Program. TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
LOCALITY
Bassendean 27 2005/06 Kelmscott 467 2004/05 & 2010/11 - 2011/12 Maida Vale 427 2004/05 - 2005/06 & 2007/08 Mosman Park 47 2005/06 Wilson/Waterford 262 2007/08 TOTAL 1,230 Maida Vale and Wilson/Waterford are subject to the developer's timing. 2) Peel/Harvey Region The following locations in the Peel/Harvey region remain to be sewered under the Infill Sewerage Program. TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
Maida Vale and Wilson/Waterford are subject to the developer's timing. 2) Peel/Harvey Region The following locations in the Peel/Harvey region remain to be sewered under the Infill Sewerage Program. TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
2) Peel/Harvey Region The following locations in the Peel/Harvey region remain to be sewered under the Infill Sewerage Program. TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
The following locations in the Peel/Harvey region remain to be sewered under the Infill Sewerage Program. TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
TOWN/ LOCALITY LOTS TARGETED PLANNED YEAR OF CONSTRUCTION Boddington 93 2015/16 Harvey 9 2010/11 Dawesville 490 2008/09 - 2009/10 Falcon 1,273 2005/06, 2007/08 - 2008/09 & 2011/12 - 2012/13 Mandurah 531 2004/05 - 2005/06 & 2017/18 - 20018/19 Medina/Calista 259 2004/05 - 2006/07 Ravenswood 53 2006/07 Waroona 182 2010/11 TOTAL 2,890 In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
LOCALITY
In summary, a total of 4,120 lots remain to be sewered under the Infill Sewerage Program in developed land within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions. Over 90% of properties within these areas have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years. There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
There are areas in these catchments that are not sewered and are not on the program. These include Dwellingup, Jarrahdale, Mundijong, North Dandalup and Serpentine which are all remote from the existing sewerage front. In the initial priority ranking for the Infill Sewerage Program, these areas did not sufficiently meet the criteria and are not on the program. To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
To date, over 43,370 lots (39,846 in metropolitan Perth and 3,524 lots in the Peel region) within the catchments of rivers and estuaries in the metropolitan Perth and Peel regions have been provided with a sewerage service under the Infill Sewerage Program over the past eleven years.
Explore WA Government Data
Search the full archive in the free dashboard, or query programmatically via API.
Explore more
Government Gazette
Appointments, regulatory notices, planning changes.
Hansard
Debates, questions, speeches and sentiment.
Tabled Papers
Reports and documents tabled in Parliament.
Committees
Committee profiles and recent reports.
Regulations
Subsidiary legislation with filters and summaries.
Bills
Proposed laws and parliamentary progress.
Acts
Current WA legislation and summaries.
Explanatory Memoranda
Bills with EMs (text/PDF) available.
Members
MP profiles, party breakdown and rankings.
Pollie Rankings
Data-driven rankings across 19 categories.
Amendment Chains
Track how schemes and regulations evolve over time.