❓ Question on Notice regarding road funding and infrastructure projects in the Great Southern region of Western Australia, specifically concerning Chester Pass Road, Mount Barker bypass, Spencer Road, and Muirs Highway. The answer provides budgetary allocations and project timelines, indicating some projects are not currently funded.
AnsweredQoN 536Legislative Assembly
QuestionView source ↗
(ii) 1 July 1997 to 30 June 1998; (iii) 1 July 1998 to 30 June 1999; (iv) 1 July 1999 to 30 June 2000; (v) 1 July 2000 to 30 June 2001; and (vi) 1 July 2001 to 30 June 2002;
(iii) 1 July 1998 to 30 June 1999; (iv) 1 July 1999 to 30 June 2000; (v) 1 July 2000 to 30 June 2001; and (vi) 1 July 2001 to 30 June 2002;
(iv) 1 July 1999 to 30 June 2000; (v) 1 July 2000 to 30 June 2001; and (vi) 1 July 2001 to 30 June 2002;
(v) 1 July 2000 to 30 June 2001; and (vi) 1 July 2001 to 30 June 2002;
(vi) 1 July 2001 to 30 June 2002;
(ii) 1 July 2003 to 30 June 2004; (iii) 1 July 2004 to 30 June 2005; (iv) 1 July 2005 to 30 June 2006; (v) 1 July 2006 to 30 June 2007; and (vi) 1 July 2007 to 30 June 2008;
(iii) 1 July 2004 to 30 June 2005; (iv) 1 July 2005 to 30 June 2006; (v) 1 July 2006 to 30 June 2007; and (vi) 1 July 2007 to 30 June 2008;
(iv) 1 July 2005 to 30 June 2006; (v) 1 July 2006 to 30 June 2007; and (vi) 1 July 2007 to 30 June 2008;
(v) 1 July 2006 to 30 June 2007; and (vi) 1 July 2007 to 30 June 2008;
(vi) 1 July 2007 to 30 June 2008;
(d) when the planned passing lanes will be constructed on Chester Pass Road; (e) when the heavy haulage northern bypass will be constructed at Mount Barker; and (f) when Spencer Road, Narrikup, will be upgraded so as to adequately and safely cater for heavy haulage vehicles?
(e) when the heavy haulage northern bypass will be constructed at Mount Barker; and (f) when Spencer Road, Narrikup, will be upgraded so as to adequately and safely cater for heavy haulage vehicles?
(f) when Spencer Road, Narrikup, will be upgraded so as to adequately and safely cater for heavy haulage vehicles?
(i) 1 July 1996 to 30 June 1997 $ 14 208 498 (ii) 1 July 1997 to 30 June 1998 $ 8 847 697 (iii) 1 July 1998 to 30 June 1999 $ 10 515 576 (iv) 1 July 1999 to 30 June 2000 $ 15 994 055 (v) 1 July 2000 to 30 June 2001 $ 18 672 445 (vi) 1 July 2001 to 30 June 2002 $ 15 338 198 (b) The budgetary allocation for road works in the Great Southern Region for the period: (i) 1 July 2002 to 30 June 2003 $ 13 578 345 (ii) 1 July 2003 to 30 June 2004 $ 8 817 495 (iii) 1 July 2004 to 30 June 2005 $ 9 573 275 (iv) 1 July 2005 to 30 June 2006 $ 9 526 829 (v) 1 July 2006 to 30 June 2007 $ 13 450 235 (vi) 1 July 2007 to 30 June 2008 $ 9 433 600 (c) The upgrading of Muirs Highway is not currently in the 4 year forward estimates for the Great Southern Region. However the South West Region have $1.2m allocated for 2002/03 and $160,000 in the 2003/04 program to widen Muirs Highway. This work is being undertaken by the Shire of Manjimup and involves widening of 8 km of the road between Nyamup and Strachan. Work commenced in January 2003 and will be undertaken over two summers with completion due in early 2004. (d)-(e) There is currently no funding 4 year forward estimates for the construction of passing lanes on Chester Pass Road or the Mount Barker Northern By-pass. (f) The funding for plantation roads is on a priority basis for projects within both the Great Southern and South West Regions. The State TIRES (Timber Industry Road Evaluation Study) Committee provides recommendations on relative priorities. There is currently no specific timetable for the upgrading of Spencer Road. Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table. 1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
(i) 1 July 2002 to 30 June 2003 $ 13 578 345 (ii) 1 July 2003 to 30 June 2004 $ 8 817 495 (iii) 1 July 2004 to 30 June 2005 $ 9 573 275 (iv) 1 July 2005 to 30 June 2006 $ 9 526 829 (v) 1 July 2006 to 30 June 2007 $ 13 450 235 (vi) 1 July 2007 to 30 June 2008 $ 9 433 600 (c) The upgrading of Muirs Highway is not currently in the 4 year forward estimates for the Great Southern Region. However the South West Region have $1.2m allocated for 2002/03 and $160,000 in the 2003/04 program to widen Muirs Highway. This work is being undertaken by the Shire of Manjimup and involves widening of 8 km of the road between Nyamup and Strachan. Work commenced in January 2003 and will be undertaken over two summers with completion due in early 2004. (d)-(e) There is currently no funding 4 year forward estimates for the construction of passing lanes on Chester Pass Road or the Mount Barker Northern By-pass. (f) The funding for plantation roads is on a priority basis for projects within both the Great Southern and South West Regions. The State TIRES (Timber Industry Road Evaluation Study) Committee provides recommendations on relative priorities. There is currently no specific timetable for the upgrading of Spencer Road. Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table. 1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
(iii) 1 July 2004 to 30 June 2005 $ 9 573 275 (iv) 1 July 2005 to 30 June 2006 $ 9 526 829 (v) 1 July 2006 to 30 June 2007 $ 13 450 235 (vi) 1 July 2007 to 30 June 2008 $ 9 433 600 (c) The upgrading of Muirs Highway is not currently in the 4 year forward estimates for the Great Southern Region. However the South West Region have $1.2m allocated for 2002/03 and $160,000 in the 2003/04 program to widen Muirs Highway. This work is being undertaken by the Shire of Manjimup and involves widening of 8 km of the road between Nyamup and Strachan. Work commenced in January 2003 and will be undertaken over two summers with completion due in early 2004. (d)-(e) There is currently no funding 4 year forward estimates for the construction of passing lanes on Chester Pass Road or the Mount Barker Northern By-pass. (f) The funding for plantation roads is on a priority basis for projects within both the Great Southern and South West Regions. The State TIRES (Timber Industry Road Evaluation Study) Committee provides recommendations on relative priorities. There is currently no specific timetable for the upgrading of Spencer Road. Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table. 1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
(d)-(e) There is currently no funding 4 year forward estimates for the construction of passing lanes on Chester Pass Road or the Mount Barker Northern By-pass. (f) The funding for plantation roads is on a priority basis for projects within both the Great Southern and South West Regions. The State TIRES (Timber Industry Road Evaluation Study) Committee provides recommendations on relative priorities. There is currently no specific timetable for the upgrading of Spencer Road. Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table. 1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
(f) The funding for plantation roads is on a priority basis for projects within both the Great Southern and South West Regions. The State TIRES (Timber Industry Road Evaluation Study) Committee provides recommendations on relative priorities. There is currently no specific timetable for the upgrading of Spencer Road. Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table. 1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table. 1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
These funding allocations are subject to review in the annual State budgetary process.
(iii) 1 July 1998 to 30 June 1999; (iv) 1 July 1999 to 30 June 2000; (v) 1 July 2000 to 30 June 2001; and (vi) 1 July 2001 to 30 June 2002;
(iv) 1 July 1999 to 30 June 2000; (v) 1 July 2000 to 30 June 2001; and (vi) 1 July 2001 to 30 June 2002;
(v) 1 July 2000 to 30 June 2001; and (vi) 1 July 2001 to 30 June 2002;
(vi) 1 July 2001 to 30 June 2002;
(ii) 1 July 2003 to 30 June 2004; (iii) 1 July 2004 to 30 June 2005; (iv) 1 July 2005 to 30 June 2006; (v) 1 July 2006 to 30 June 2007; and (vi) 1 July 2007 to 30 June 2008;
(iii) 1 July 2004 to 30 June 2005; (iv) 1 July 2005 to 30 June 2006; (v) 1 July 2006 to 30 June 2007; and (vi) 1 July 2007 to 30 June 2008;
(iv) 1 July 2005 to 30 June 2006; (v) 1 July 2006 to 30 June 2007; and (vi) 1 July 2007 to 30 June 2008;
(v) 1 July 2006 to 30 June 2007; and (vi) 1 July 2007 to 30 June 2008;
(vi) 1 July 2007 to 30 June 2008;
(d) when the planned passing lanes will be constructed on Chester Pass Road; (e) when the heavy haulage northern bypass will be constructed at Mount Barker; and (f) when Spencer Road, Narrikup, will be upgraded so as to adequately and safely cater for heavy haulage vehicles?
(e) when the heavy haulage northern bypass will be constructed at Mount Barker; and (f) when Spencer Road, Narrikup, will be upgraded so as to adequately and safely cater for heavy haulage vehicles?
(f) when Spencer Road, Narrikup, will be upgraded so as to adequately and safely cater for heavy haulage vehicles?
(i) 1 July 1996 to 30 June 1997 $ 14 208 498 (ii) 1 July 1997 to 30 June 1998 $ 8 847 697 (iii) 1 July 1998 to 30 June 1999 $ 10 515 576 (iv) 1 July 1999 to 30 June 2000 $ 15 994 055 (v) 1 July 2000 to 30 June 2001 $ 18 672 445 (vi) 1 July 2001 to 30 June 2002 $ 15 338 198 (b) The budgetary allocation for road works in the Great Southern Region for the period: (i) 1 July 2002 to 30 June 2003 $ 13 578 345 (ii) 1 July 2003 to 30 June 2004 $ 8 817 495 (iii) 1 July 2004 to 30 June 2005 $ 9 573 275 (iv) 1 July 2005 to 30 June 2006 $ 9 526 829 (v) 1 July 2006 to 30 June 2007 $ 13 450 235 (vi) 1 July 2007 to 30 June 2008 $ 9 433 600 (c) The upgrading of Muirs Highway is not currently in the 4 year forward estimates for the Great Southern Region. However the South West Region have $1.2m allocated for 2002/03 and $160,000 in the 2003/04 program to widen Muirs Highway. This work is being undertaken by the Shire of Manjimup and involves widening of 8 km of the road between Nyamup and Strachan. Work commenced in January 2003 and will be undertaken over two summers with completion due in early 2004. (d)-(e) There is currently no funding 4 year forward estimates for the construction of passing lanes on Chester Pass Road or the Mount Barker Northern By-pass. (f) The funding for plantation roads is on a priority basis for projects within both the Great Southern and South West Regions. The State TIRES (Timber Industry Road Evaluation Study) Committee provides recommendations on relative priorities. There is currently no specific timetable for the upgrading of Spencer Road. Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table. 1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
(i) 1 July 2002 to 30 June 2003 $ 13 578 345 (ii) 1 July 2003 to 30 June 2004 $ 8 817 495 (iii) 1 July 2004 to 30 June 2005 $ 9 573 275 (iv) 1 July 2005 to 30 June 2006 $ 9 526 829 (v) 1 July 2006 to 30 June 2007 $ 13 450 235 (vi) 1 July 2007 to 30 June 2008 $ 9 433 600 (c) The upgrading of Muirs Highway is not currently in the 4 year forward estimates for the Great Southern Region. However the South West Region have $1.2m allocated for 2002/03 and $160,000 in the 2003/04 program to widen Muirs Highway. This work is being undertaken by the Shire of Manjimup and involves widening of 8 km of the road between Nyamup and Strachan. Work commenced in January 2003 and will be undertaken over two summers with completion due in early 2004. (d)-(e) There is currently no funding 4 year forward estimates for the construction of passing lanes on Chester Pass Road or the Mount Barker Northern By-pass. (f) The funding for plantation roads is on a priority basis for projects within both the Great Southern and South West Regions. The State TIRES (Timber Industry Road Evaluation Study) Committee provides recommendations on relative priorities. There is currently no specific timetable for the upgrading of Spencer Road. Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table. 1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
(iii) 1 July 2004 to 30 June 2005 $ 9 573 275 (iv) 1 July 2005 to 30 June 2006 $ 9 526 829 (v) 1 July 2006 to 30 June 2007 $ 13 450 235 (vi) 1 July 2007 to 30 June 2008 $ 9 433 600 (c) The upgrading of Muirs Highway is not currently in the 4 year forward estimates for the Great Southern Region. However the South West Region have $1.2m allocated for 2002/03 and $160,000 in the 2003/04 program to widen Muirs Highway. This work is being undertaken by the Shire of Manjimup and involves widening of 8 km of the road between Nyamup and Strachan. Work commenced in January 2003 and will be undertaken over two summers with completion due in early 2004. (d)-(e) There is currently no funding 4 year forward estimates for the construction of passing lanes on Chester Pass Road or the Mount Barker Northern By-pass. (f) The funding for plantation roads is on a priority basis for projects within both the Great Southern and South West Regions. The State TIRES (Timber Industry Road Evaluation Study) Committee provides recommendations on relative priorities. There is currently no specific timetable for the upgrading of Spencer Road. Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table. 1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
(d)-(e) There is currently no funding 4 year forward estimates for the construction of passing lanes on Chester Pass Road or the Mount Barker Northern By-pass. (f) The funding for plantation roads is on a priority basis for projects within both the Great Southern and South West Regions. The State TIRES (Timber Industry Road Evaluation Study) Committee provides recommendations on relative priorities. There is currently no specific timetable for the upgrading of Spencer Road. Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table. 1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
(f) The funding for plantation roads is on a priority basis for projects within both the Great Southern and South West Regions. The State TIRES (Timber Industry Road Evaluation Study) Committee provides recommendations on relative priorities. There is currently no specific timetable for the upgrading of Spencer Road. Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table. 1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table. 1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
1 July 2003 to 30 June 2004 $ 2 430 000 1 July 2004 to 30 June 2005 $ 1 424 000 1 July 2005 to 30 June 2006 $ 1 550 000 1 July 2006 to 30 June 2007 $ 3 500 000 1 July 2007 to 30 June 2008 $ 5 780 000 These funding allocations are subject to review in the annual State budgetary process.
These funding allocations are subject to review in the annual State budgetary process.
AnswerView source ↗
Answered
25 February 2003
Responded by
Minister for Planning and Infrastructure
Response time
111 days
(a) The total funds spent on main roads in the Great Southern Region for the periods:
(i) 1 July 1996 to 30 June 1997 $ 14 208 498
(ii) 1 July 1997 to 30 June 1998 $ 8 847 697
(iii) 1 July 1998 to 30 June 1999 $ 10 515 576
(iv) 1 July 1999 to 30 June 2000 $ 15 994 055
(v) 1 July 2000 to 30 June 2001 $ 18 672 445
(vi) 1 July 2001 to 30 June 2002 $ 15 338 198
(b) The budgetary allocation for road works in the Great Southern Region for the period:
(i) 1 July 2002 to 30 June 2003 $ 13 578 345
(ii) 1 July 2003 to 30 June 2004 $ 8 817 495
(iii) 1 July 2004 to 30 June 2005 $ 9 573 275
(iv) 1 July 2005 to 30 June 2006 $ 9 526 829
(v) 1 July 2006 to 30 June 2007 $ 13 450 235
(vi) 1 July 2007 to 30 June 2008 $ 9 433 600
(c) The upgrading of Muirs Highway is not currently in the 4 year forward estimates for the Great Southern Region. However the South West Region have $1.2m allocated for 2002/03 and $160,000 in the 2003/04 program to widen Muirs Highway. This work is being undertaken by the Shire of Manjimup and involves widening of 8 km of the road between Nyamup and Strachan. Work commenced in January 2003 and will be undertaken over two summers with completion due in early 2004.
(d)-(e) There is currently no funding 4 year forward estimates for the construction of passing lanes on Chester Pass Road or the Mount Barker Northern By-pass.
(f) The funding for plantation roads is on a priority basis for projects within both the Great Southern and South West Regions. The State TIRES (Timber Industry Road Evaluation Study) Committee provides recommendations on relative priorities. There is currently no specific timetable for the upgrading of Spencer Road.
Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table.
1 July 2003 to 30 June 2004 $ 2 430 000
1 July 2004 to 30 June 2005 $ 1 424 000
1 July 2005 to 30 June 2006 $ 1 550 000
1 July 2006 to 30 June 2007 $ 3 500 000
1 July 2007 to 30 June 2008 $ 5 780 000
These funding allocations are subject to review in the annual State budgetary process.
(i) 1 July 1996 to 30 June 1997 $ 14 208 498
(ii) 1 July 1997 to 30 June 1998 $ 8 847 697
(iii) 1 July 1998 to 30 June 1999 $ 10 515 576
(iv) 1 July 1999 to 30 June 2000 $ 15 994 055
(v) 1 July 2000 to 30 June 2001 $ 18 672 445
(vi) 1 July 2001 to 30 June 2002 $ 15 338 198
(b) The budgetary allocation for road works in the Great Southern Region for the period:
(i) 1 July 2002 to 30 June 2003 $ 13 578 345
(ii) 1 July 2003 to 30 June 2004 $ 8 817 495
(iii) 1 July 2004 to 30 June 2005 $ 9 573 275
(iv) 1 July 2005 to 30 June 2006 $ 9 526 829
(v) 1 July 2006 to 30 June 2007 $ 13 450 235
(vi) 1 July 2007 to 30 June 2008 $ 9 433 600
(c) The upgrading of Muirs Highway is not currently in the 4 year forward estimates for the Great Southern Region. However the South West Region have $1.2m allocated for 2002/03 and $160,000 in the 2003/04 program to widen Muirs Highway. This work is being undertaken by the Shire of Manjimup and involves widening of 8 km of the road between Nyamup and Strachan. Work commenced in January 2003 and will be undertaken over two summers with completion due in early 2004.
(d)-(e) There is currently no funding 4 year forward estimates for the construction of passing lanes on Chester Pass Road or the Mount Barker Northern By-pass.
(f) The funding for plantation roads is on a priority basis for projects within both the Great Southern and South West Regions. The State TIRES (Timber Industry Road Evaluation Study) Committee provides recommendations on relative priorities. There is currently no specific timetable for the upgrading of Spencer Road.
Proposed funding in Main Roads' Major Projects and Local Roads Program for the Blue Gum Plantation Roads is as per the following table.
1 July 2003 to 30 June 2004 $ 2 430 000
1 July 2004 to 30 June 2005 $ 1 424 000
1 July 2005 to 30 June 2006 $ 1 550 000
1 July 2006 to 30 June 2007 $ 3 500 000
1 July 2007 to 30 June 2008 $ 5 780 000
These funding allocations are subject to review in the annual State budgetary process.
Explore WA Government Data
Search the full archive in the free dashboard, or query programmatically via API.
Explore more
Government Gazette
Appointments, regulatory notices, planning changes.
Hansard
Debates, questions, speeches and sentiment.
Tabled Papers
Reports and documents tabled in Parliament.
Committees
Committee profiles and recent reports.
Regulations
Subsidiary legislation with filters and summaries.
Bills
Proposed laws and parliamentary progress.
Acts
Current WA legislation and summaries.
Explanatory Memoranda
Bills with EMs (text/PDF) available.
Members
MP profiles, party breakdown and rankings.
Pollie Rankings
Data-driven rankings across 19 categories.
Amendment Chains
Track how schemes and regulations evolve over time.