A WA parliamentary question seeks details on variations to Agreement Acts approved by the Minister for State Development since February 2003, including purpose, dates of approval, submission, and tabling. The response details 10 approved variations, primarily related to Alumina and Iron Ore agreements, with several aimed at compliance with the Environmental Protection Act.

AnsweredQoN 2192Legislative Assembly
Asked
28 October 2003
Portfolio
State Development

QuestionView source ↗

(1) Since February 2003 which Agreement Acts have been varied by the Minister granting approval for a variation?
(2) In each instance where approval has been granted -
(a) what is the purpose of the variation;
(b) on what date was the variation approved;
(c) on what date was the variation submitted to the Government; and
(d) on what date was the variation tabled in State Parliament?
(3) If any Agreement Act variations have been rejected by the Minister -
(a) which variations were rejected;
(b) what was the reason for rejection; and
(c) in each case, if revamped variations have been resubmitted, on what date was each variation subsequently approved?
(4) How many variations have been submitted that have been withdrawn or amended?

AnswerView source ↗

Answered
4 December 2003
Responded by
Minister for State Development
Response time
37 days
(b) on what date was the variation approved; (c) on what date was the variation submitted to the Government; and (d) on what date was the variation tabled in State Parliament?
(c) on what date was the variation submitted to the Government; and (d) on what date was the variation tabled in State Parliament?
(d) on what date was the variation tabled in State Parliament?
(b) what was the reason for rejection; and (c) in each case, if revamped variations have been resubmitted, on what date was each variation subsequently approved?
(c) in each case, if revamped variations have been resubmitted, on what date was each variation subsequently approved?
Agreement Act Variations Since February 2003 (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To remove land from Agreement at Pinjarra for the Alinta Gas Power Station (2b) 17 June 2003 (2c) 19 May 2003 (2d) 25 June 2003 (1) Alumina Refinery Agreement 1961 (2a) To bring Agreement into full compliance with the EP Act* (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To remove land from Agreement at Pinjarra for the Alinta Gas Power Station (2b) 17 June 2003 (2c) 19 May 2003 (2d) 25 June 2003 (1) Alumina Refinery Agreement 1961 (2a) To bring Agreement into full compliance with the EP Act* (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2a) To remove land from Agreement at Pinjarra for the Alinta Gas Power Station (2b) 17 June 2003 (2c) 19 May 2003 (2d) 25 June 2003 (1) Alumina Refinery Agreement 1961 (2a) To bring Agreement into full compliance with the EP Act* (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2b) 17 June 2003 (2c) 19 May 2003 (2d) 25 June 2003 (1) Alumina Refinery Agreement 1961 (2a) To bring Agreement into full compliance with the EP Act* (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2c) 19 May 2003 (2d) 25 June 2003 (1) Alumina Refinery Agreement 1961 (2a) To bring Agreement into full compliance with the EP Act* (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2d) 25 June 2003 (1) Alumina Refinery Agreement 1961 (2a) To bring Agreement into full compliance with the EP Act* (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Alumina Refinery Agreement 1961 (2a) To bring Agreement into full compliance with the EP Act* (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Alumina Refinery Agreement 1961 (2a) To bring Agreement into full compliance with the EP Act* (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2a) To bring Agreement into full compliance with the EP Act* (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2c) 18 July 2003 (2d) 16 September 2003 (1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2d) 16 September 2003 (1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Alumina Refinery (Mitchell Plateau) Agreement 1971 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2c) 18 July 2003 (2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2d) Non Tabled Variation (1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Alumina Refinery (Pinjarra) Agreement 1969 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2b) 29 August 2003 (2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2c) 18 July 2003 (2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2d) 16 September 2003 (1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Evaporites (Lake Macleod) Agreement 1967 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Iron Ore (Hamersley Range) Agreement 1963 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2d) Non Tabled Variation (1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Iron Ore (Hamersley Range) Agreement 1968 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2d) Non Tabled Variation (1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Iron Ore (Mount Newman) Agreement 1964 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2c) 18 July 2003 (2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2d) Non Tabled Variation (1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Leslie Solar Salt Industry Agreement 1966 (2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2a) To bring Agreement into full compliance with the EP Act (2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2b) 29 August 2003 (2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2c) 18 July 2003 (2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2d) Non Tabled Variation (1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Iron Ore - Direct Reduced Iron (BHP) Agreement 1996 (2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2a) At Clause 33 vary year to 2003 to extend the stamp duty exemption period (2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2b) 1 September 2003 (2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2c) 18 August 2003 (2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2d) 18 September 2003 (1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(1) Iron Ore (Hope Downs) Agreement 1992 (2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2a) To facilitate the submission of detailed proposals for the development of a railway from the mining lease to a ship loading facility at Port Hedland and other project issues (2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2b) 22 October 2003 (2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2c) 20 October 2003 (2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(2d) 23 October 2003 * EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
* EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
* EP Act = Environmental Protection Act 1986 (3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(3) Due to the process and manner by which variations are developed and negotiated between the parties, no variations where rejected. (4) None.
(4) None.
(4) None.

Explore WA Government Data

Search the full archive in the free dashboard, or query programmatically via API.

Explore more