❓ A WA parliamentary question requests a list of schools in Kalgoorlie-Boulder benefiting from the 'Fixing Our Schools' program and a breakdown of proposed repairs. The Minister provides a list of schools and funding amounts but cannot provide a detailed breakdown due to principal-led prioritization.
AnsweredQoN 1069Legislative Council
QuestionView source ↗
I refer to the recent article in The West Australian that outlined the Government’s intention to undertake maintenance and other work on the State’s schools. (1) Will the minister provide a list of all schools in the City of Kalgoorlie-Boulder that will benefit from this policy and the amount of money to be spent on each school? (2) Will the minister provide an itemised breakdown of proposed repairs, maintenance and capital works for each of the relevant schools with the corresponding dollar amounts for each line item? Hon GRAHAM GIFFARD
AnswerView source ↗
(1)-(2) All schools have had maintenance funding allocated under the $65 million Fixing Our Schools program. Within the City of Kalgoorlie-Boulder the following schools will receive maintenance funding - I have a substantial list that I will table, and I seek leave to have incorporated in Hansard . Leave granted. The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
(1) Will the minister provide a list of all schools in the City of Kalgoorlie-Boulder that will benefit from this policy and the amount of money to be spent on each school? (2) Will the minister provide an itemised breakdown of proposed repairs, maintenance and capital works for each of the relevant schools with the corresponding dollar amounts for each line item? Hon GRAHAM GIFFARD replied: (1)-(2) All schools have had maintenance funding allocated under the $65 million Fixing Our Schools program. Within the City of Kalgoorlie-Boulder the following schools will receive maintenance funding - I have a substantial list that I will table, and I seek leave to have incorporated in Hansard . Leave granted. The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
(2) Will the minister provide an itemised breakdown of proposed repairs, maintenance and capital works for each of the relevant schools with the corresponding dollar amounts for each line item? Hon GRAHAM GIFFARD replied: (1)-(2) All schools have had maintenance funding allocated under the $65 million Fixing Our Schools program. Within the City of Kalgoorlie-Boulder the following schools will receive maintenance funding - I have a substantial list that I will table, and I seek leave to have incorporated in Hansard . Leave granted. The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
Hon GRAHAM GIFFARD replied: (1)-(2) All schools have had maintenance funding allocated under the $65 million Fixing Our Schools program. Within the City of Kalgoorlie-Boulder the following schools will receive maintenance funding - I have a substantial list that I will table, and I seek leave to have incorporated in Hansard . Leave granted. The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
(1)-(2) All schools have had maintenance funding allocated under the $65 million Fixing Our Schools program. Within the City of Kalgoorlie-Boulder the following schools will receive maintenance funding - I have a substantial list that I will table, and I seek leave to have incorporated in Hansard . Leave granted. The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
Leave granted. The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
(1) Will the minister provide a list of all schools in the City of Kalgoorlie-Boulder that will benefit from this policy and the amount of money to be spent on each school? (2) Will the minister provide an itemised breakdown of proposed repairs, maintenance and capital works for each of the relevant schools with the corresponding dollar amounts for each line item? Hon GRAHAM GIFFARD replied: (1)-(2) All schools have had maintenance funding allocated under the $65 million Fixing Our Schools program. Within the City of Kalgoorlie-Boulder the following schools will receive maintenance funding - I have a substantial list that I will table, and I seek leave to have incorporated in Hansard . Leave granted. The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
(2) Will the minister provide an itemised breakdown of proposed repairs, maintenance and capital works for each of the relevant schools with the corresponding dollar amounts for each line item? Hon GRAHAM GIFFARD replied: (1)-(2) All schools have had maintenance funding allocated under the $65 million Fixing Our Schools program. Within the City of Kalgoorlie-Boulder the following schools will receive maintenance funding - I have a substantial list that I will table, and I seek leave to have incorporated in Hansard . Leave granted. The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
Hon GRAHAM GIFFARD replied: (1)-(2) All schools have had maintenance funding allocated under the $65 million Fixing Our Schools program. Within the City of Kalgoorlie-Boulder the following schools will receive maintenance funding - I have a substantial list that I will table, and I seek leave to have incorporated in Hansard . Leave granted. The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
(1)-(2) All schools have had maintenance funding allocated under the $65 million Fixing Our Schools program. Within the City of Kalgoorlie-Boulder the following schools will receive maintenance funding - I have a substantial list that I will table, and I seek leave to have incorporated in Hansard . Leave granted. The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
Leave granted. The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
The following material was incorporated - Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
Boulder Primary School $278,892 East Kalgoorlie Primary School $69,048 East Kalgoorlie Pre-Primary School $66,598 Eastern Goldfields Senior High School $839,527 Hannans Primary School $51,966 Kalgoorlie Camp School $423,210 Kalgoorlie Primary School $311,262 Kalgoorlie School of the Air $40,154 North Kalgoorlie Primary School $335,464 North Kalgoorlie Pre-Primary School $30,392 O’Connor Primary School $95,623 South Kalgoorlie Primary School $216,205 South Kalgoorlie Pre-Primary School $22,598 Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
Hon GRAHAM GIFFARD: It is not possible to provide an accurate list of all the maintenance and repair work that will be undertaken under this program as the principal in each school, in consultation with the local Department of Housing and Works representative and the facility manager, will determine priorities. Priorities 1 to 7 in the building condition assessment will form the basis of this process. A total amount of $2 million was allocated for capital works in the Department of Education and Training’s 2003-04 and 2004-05 capital works program to provide additions at the South Kalgoorlie Primary School. This will include a new library, resource centre, covered assembly area, canteen, music room and dental therapy clinic.
Explore WA Government Data
Search the full archive in the free dashboard, or query programmatically via API.
Explore more
Government Gazette
Appointments, regulatory notices, planning changes.
Hansard
Debates, questions, speeches and sentiment.
Tabled Papers
Reports and documents tabled in Parliament.
Committees
Committee profiles and recent reports.
Regulations
Subsidiary legislation with filters and summaries.
Bills
Proposed laws and parliamentary progress.
Acts
Current WA legislation and summaries.
Explanatory Memoranda
Bills with EMs (text/PDF) available.
Members
MP profiles, party breakdown and rankings.
Pollie Rankings
Data-driven rankings across 19 categories.
Amendment Chains
Track how schemes and regulations evolve over time.