A WA parliamentary question on notice regarding health infrastructure projects across the state, seeking details on costs, timelines, and scope of works for various facilities and initiatives outlined in the 2004-2005 budget papers. The response provides specific information on projects, costs, and timelines.

AnsweredQoN 2039Legislative Council
Asked
1 June 2004
Portfolio
Health

QuestionView source ↗

I refer the Minister to pages 582 and 583 of the 2004-2005 Budget Papers -
(1) With regard to the Statewide expansion of community health facilities, costed at a total of $6 million, what are those facilities?
(2) For each of the facilities in (1), what work is being undertaken?
(3) For each of the facilities in (1), what is the total cost and expected completion date of each project?
(4) With regard to the developments at Royal Perth and Shenton Park Hospitals, what work is being undertaken at each hospital?
(5) For the work in (4), what is the expected completion date for each project?
(6) With regard to the Kimberley health developments, what work is being undertaken?
(7) For each of the projects in (6), what is the expected total cost and expected completion date?
(8) With regard to the land acquisition, costing $4.35 million, what land is being acquired, and for what purpose?
(9) With regard to the line item ‘Carryover items - various’, costed at $2.868m, what are these items?
(10) For each of the items in (9), what is the cost of each project and expected completion date?
(11) With regard to the Carnarvon Hospital Development, what work is being undertaken, and what is the expected completion date of this work?
(12) With regard to the redevelopment of Geraldton Health Campus, what is the expected completion date of this project?
(13) With regard to the redevelopment of the Kalamunda Hospital, what is the expected completion date of this project?
(14) With regard to the upgrade of Margaret River Hospital, what is the expected completion date of this project?
(15) With regard to the Morawa Hospital emergency development, what is the expected completion date of this project?
(16) With regard to the Port Hedland Health Service, what work is being undertaken, and what is the expected completion date of this work?
(17) With regard to the replacement Warburton clinic, what is the expected completion date of this work?
(18) With regard to the line item ‘Infrastructure planning’, what planning is being undertaken?
(19) With regard to the line item ‘Statewide condition audit’, which facilities are being audited?
(20) With regard to audits in (19), will the results of these audits be made publicly available?
(21) With regard to the Broome Hospital redevelopment, what work is being carried out, and what is the expected completion date of this project?
(22) With regard to the line item ‘Country staff accommodation’, what work, in what locations, is being undertaken?
(23) With regard to the accommodation in (22), what is the expected completion dates of each project?
(24) With regard to the Hedland Health Campus redevelopment, what is the expected completion date of this project?
(25) With regard to the Wyndham/Kununurra redevelopment, what work is being undertaken, and what is the expected completion date of this project?
(26) With regard to the State Cancer Centre, what is the expected completion date of this project?
(27) With regard to the upgrade of Rockingham-Kwinana, what is the expected completion date of this project?
(28) With regard to the southern tertiary hospital, where is this hospital to be located?
(29) What is the expected completion date of the southern tertiary hospital?
(30) With regard to the line item ‘Corporate and shared services reform’ what works are being undertaken?
(31) What is the expected completion date of the works in (30)?
(32) With regard to the line item ‘Information and Communication Equipment and Infrastructure - corporate and shared services reform’, what works are being undertaken?
(33) What is the total cost and expected completion date of each project in (32)?
(34) With regard to the line item ‘Information and Communication Equipment and Infrastructure’, what works are being undertaken?
(35) What is the expected completion date of the works in (34)?
(36) With regard to the line item ‘Equipment Replacement’, what works are being undertaken?
(37) For each of the projects in (36), what is the total cost and expected completion date of each project?
(38) With regard to the line item ‘Minor Works - Buildings and Services’, what work is being undertaken?
(39) For each of the projects in (38), what is the total cost and expected completion date?

AnswerView source ↗

Answered
22 June 2004
Responded by
Parliamentary Secretary representing the Minister for Health
Response time
21 days
Estimated Cost Completion Due Leonora Community Health Centre $1.0m July 2004 Mandurah Community Health Centre $3.8m June 2005 Port Hedland Community Health Centre $0.25m February 2005 Whitby Falls Mental Health $0.25m April 2005 Fremantle Cancer Screening $0.3m Completed 2003 Rockingham Cancer Screening $0.4m December 2004 (2) Leonora - New Community Health Centre. Mandurah - New Community Health Centre. Pt Hedland - New Community Health Centre. Whitby Falls - New residential accommodation for Mental Health patients. Fremantle - Relocation of breast screening facility. Rockingham - New Breast Screening Centre. (3) See Question 1. (4) Royal Perth Hospital: Wellington Street Campus a) Refurbishment of Wards 5A/5B (general ward/supervised care unit) b) Intensive Care Unit: construction of single room isolation facilities c) Intensive Care Unit: construction of security screen, reception area d) Emergency Department: construction of Holding Bay shower e) Refurbishment of Ward 6B (renal patient treatment/peritoneal dialysis training) f) Redesign of Ultrasound area, Radiology Outpatients g) Refurbishment of Ward 10A (oncology inpatient ward) Royal Perth Hospital: Shenton Park Campus a) Refurbishment of Ward X1 (Spinal Unit) b) Refurbishment of Ward X (Orthopaedics) c) Relocation/refurbishment of Spinal Gymnasium d) Relocation/refurbishment of Joint Replacement Assessment Clinic e) Refurbishment of Wards 7/9 Pantry (5) Expected Completion Dates: Wellington Street Campus: a) May 28 2004 b) June 30 2004 c) June 15 2004 d) June 30 2004 e) November 30 2004 f) October 31 2004 g) March 31 2005 Shenton Park Campus: a) March 30 2004 b) April 30 2005 c) July 31 2004 d) July 14 2004 e) July 31 2004 (6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(2) Leonora - New Community Health Centre. Mandurah - New Community Health Centre. Pt Hedland - New Community Health Centre. Whitby Falls - New residential accommodation for Mental Health patients. Fremantle - Relocation of breast screening facility. Rockingham - New Breast Screening Centre. (3) See Question 1. (4) Royal Perth Hospital: Wellington Street Campus a) Refurbishment of Wards 5A/5B (general ward/supervised care unit) b) Intensive Care Unit: construction of single room isolation facilities c) Intensive Care Unit: construction of security screen, reception area d) Emergency Department: construction of Holding Bay shower e) Refurbishment of Ward 6B (renal patient treatment/peritoneal dialysis training) f) Redesign of Ultrasound area, Radiology Outpatients g) Refurbishment of Ward 10A (oncology inpatient ward) Royal Perth Hospital: Shenton Park Campus a) Refurbishment of Ward X1 (Spinal Unit) b) Refurbishment of Ward X (Orthopaedics) c) Relocation/refurbishment of Spinal Gymnasium d) Relocation/refurbishment of Joint Replacement Assessment Clinic e) Refurbishment of Wards 7/9 Pantry (5) Expected Completion Dates: Wellington Street Campus: a) May 28 2004 b) June 30 2004 c) June 15 2004 d) June 30 2004 e) November 30 2004 f) October 31 2004 g) March 31 2005 Shenton Park Campus: a) March 30 2004 b) April 30 2005 c) July 31 2004 d) July 14 2004 e) July 31 2004 (6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
Mandurah - New Community Health Centre. Pt Hedland - New Community Health Centre. Whitby Falls - New residential accommodation for Mental Health patients. Fremantle - Relocation of breast screening facility. Rockingham - New Breast Screening Centre. (3) See Question 1. (4) Royal Perth Hospital: Wellington Street Campus a) Refurbishment of Wards 5A/5B (general ward/supervised care unit) b) Intensive Care Unit: construction of single room isolation facilities c) Intensive Care Unit: construction of security screen, reception area d) Emergency Department: construction of Holding Bay shower e) Refurbishment of Ward 6B (renal patient treatment/peritoneal dialysis training) f) Redesign of Ultrasound area, Radiology Outpatients g) Refurbishment of Ward 10A (oncology inpatient ward) Royal Perth Hospital: Shenton Park Campus a) Refurbishment of Ward X1 (Spinal Unit) b) Refurbishment of Ward X (Orthopaedics) c) Relocation/refurbishment of Spinal Gymnasium d) Relocation/refurbishment of Joint Replacement Assessment Clinic e) Refurbishment of Wards 7/9 Pantry (5) Expected Completion Dates: Wellington Street Campus: a) May 28 2004 b) June 30 2004 c) June 15 2004 d) June 30 2004 e) November 30 2004 f) October 31 2004 g) March 31 2005 Shenton Park Campus: a) March 30 2004 b) April 30 2005 c) July 31 2004 d) July 14 2004 e) July 31 2004 (6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
Pt Hedland - New Community Health Centre. Whitby Falls - New residential accommodation for Mental Health patients. Fremantle - Relocation of breast screening facility. Rockingham - New Breast Screening Centre. (3) See Question 1. (4) Royal Perth Hospital: Wellington Street Campus a) Refurbishment of Wards 5A/5B (general ward/supervised care unit) b) Intensive Care Unit: construction of single room isolation facilities c) Intensive Care Unit: construction of security screen, reception area d) Emergency Department: construction of Holding Bay shower e) Refurbishment of Ward 6B (renal patient treatment/peritoneal dialysis training) f) Redesign of Ultrasound area, Radiology Outpatients g) Refurbishment of Ward 10A (oncology inpatient ward) Royal Perth Hospital: Shenton Park Campus a) Refurbishment of Ward X1 (Spinal Unit) b) Refurbishment of Ward X (Orthopaedics) c) Relocation/refurbishment of Spinal Gymnasium d) Relocation/refurbishment of Joint Replacement Assessment Clinic e) Refurbishment of Wards 7/9 Pantry (5) Expected Completion Dates: Wellington Street Campus: a) May 28 2004 b) June 30 2004 c) June 15 2004 d) June 30 2004 e) November 30 2004 f) October 31 2004 g) March 31 2005 Shenton Park Campus: a) March 30 2004 b) April 30 2005 c) July 31 2004 d) July 14 2004 e) July 31 2004 (6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
Whitby Falls - New residential accommodation for Mental Health patients. Fremantle - Relocation of breast screening facility. Rockingham - New Breast Screening Centre. (3) See Question 1. (4) Royal Perth Hospital: Wellington Street Campus a) Refurbishment of Wards 5A/5B (general ward/supervised care unit) b) Intensive Care Unit: construction of single room isolation facilities c) Intensive Care Unit: construction of security screen, reception area d) Emergency Department: construction of Holding Bay shower e) Refurbishment of Ward 6B (renal patient treatment/peritoneal dialysis training) f) Redesign of Ultrasound area, Radiology Outpatients g) Refurbishment of Ward 10A (oncology inpatient ward) Royal Perth Hospital: Shenton Park Campus a) Refurbishment of Ward X1 (Spinal Unit) b) Refurbishment of Ward X (Orthopaedics) c) Relocation/refurbishment of Spinal Gymnasium d) Relocation/refurbishment of Joint Replacement Assessment Clinic e) Refurbishment of Wards 7/9 Pantry (5) Expected Completion Dates: Wellington Street Campus: a) May 28 2004 b) June 30 2004 c) June 15 2004 d) June 30 2004 e) November 30 2004 f) October 31 2004 g) March 31 2005 Shenton Park Campus: a) March 30 2004 b) April 30 2005 c) July 31 2004 d) July 14 2004 e) July 31 2004 (6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
Fremantle - Relocation of breast screening facility. Rockingham - New Breast Screening Centre. (3) See Question 1. (4) Royal Perth Hospital: Wellington Street Campus a) Refurbishment of Wards 5A/5B (general ward/supervised care unit) b) Intensive Care Unit: construction of single room isolation facilities c) Intensive Care Unit: construction of security screen, reception area d) Emergency Department: construction of Holding Bay shower e) Refurbishment of Ward 6B (renal patient treatment/peritoneal dialysis training) f) Redesign of Ultrasound area, Radiology Outpatients g) Refurbishment of Ward 10A (oncology inpatient ward) Royal Perth Hospital: Shenton Park Campus a) Refurbishment of Ward X1 (Spinal Unit) b) Refurbishment of Ward X (Orthopaedics) c) Relocation/refurbishment of Spinal Gymnasium d) Relocation/refurbishment of Joint Replacement Assessment Clinic e) Refurbishment of Wards 7/9 Pantry (5) Expected Completion Dates: Wellington Street Campus: a) May 28 2004 b) June 30 2004 c) June 15 2004 d) June 30 2004 e) November 30 2004 f) October 31 2004 g) March 31 2005 Shenton Park Campus: a) March 30 2004 b) April 30 2005 c) July 31 2004 d) July 14 2004 e) July 31 2004 (6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
Rockingham - New Breast Screening Centre. (3) See Question 1. (4) Royal Perth Hospital: Wellington Street Campus a) Refurbishment of Wards 5A/5B (general ward/supervised care unit) b) Intensive Care Unit: construction of single room isolation facilities c) Intensive Care Unit: construction of security screen, reception area d) Emergency Department: construction of Holding Bay shower e) Refurbishment of Ward 6B (renal patient treatment/peritoneal dialysis training) f) Redesign of Ultrasound area, Radiology Outpatients g) Refurbishment of Ward 10A (oncology inpatient ward) Royal Perth Hospital: Shenton Park Campus a) Refurbishment of Ward X1 (Spinal Unit) b) Refurbishment of Ward X (Orthopaedics) c) Relocation/refurbishment of Spinal Gymnasium d) Relocation/refurbishment of Joint Replacement Assessment Clinic e) Refurbishment of Wards 7/9 Pantry (5) Expected Completion Dates: Wellington Street Campus: a) May 28 2004 b) June 30 2004 c) June 15 2004 d) June 30 2004 e) November 30 2004 f) October 31 2004 g) March 31 2005 Shenton Park Campus: a) March 30 2004 b) April 30 2005 c) July 31 2004 d) July 14 2004 e) July 31 2004 (6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(3) See Question 1. (4) Royal Perth Hospital: Wellington Street Campus a) Refurbishment of Wards 5A/5B (general ward/supervised care unit) b) Intensive Care Unit: construction of single room isolation facilities c) Intensive Care Unit: construction of security screen, reception area d) Emergency Department: construction of Holding Bay shower e) Refurbishment of Ward 6B (renal patient treatment/peritoneal dialysis training) f) Redesign of Ultrasound area, Radiology Outpatients g) Refurbishment of Ward 10A (oncology inpatient ward) Royal Perth Hospital: Shenton Park Campus a) Refurbishment of Ward X1 (Spinal Unit) b) Refurbishment of Ward X (Orthopaedics) c) Relocation/refurbishment of Spinal Gymnasium d) Relocation/refurbishment of Joint Replacement Assessment Clinic e) Refurbishment of Wards 7/9 Pantry (5) Expected Completion Dates: Wellington Street Campus: a) May 28 2004 b) June 30 2004 c) June 15 2004 d) June 30 2004 e) November 30 2004 f) October 31 2004 g) March 31 2005 Shenton Park Campus: a) March 30 2004 b) April 30 2005 c) July 31 2004 d) July 14 2004 e) July 31 2004 (6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(4) Royal Perth Hospital: Wellington Street Campus a) Refurbishment of Wards 5A/5B (general ward/supervised care unit) b) Intensive Care Unit: construction of single room isolation facilities c) Intensive Care Unit: construction of security screen, reception area d) Emergency Department: construction of Holding Bay shower e) Refurbishment of Ward 6B (renal patient treatment/peritoneal dialysis training) f) Redesign of Ultrasound area, Radiology Outpatients g) Refurbishment of Ward 10A (oncology inpatient ward) Royal Perth Hospital: Shenton Park Campus a) Refurbishment of Ward X1 (Spinal Unit) b) Refurbishment of Ward X (Orthopaedics) c) Relocation/refurbishment of Spinal Gymnasium d) Relocation/refurbishment of Joint Replacement Assessment Clinic e) Refurbishment of Wards 7/9 Pantry (5) Expected Completion Dates: Wellington Street Campus: a) May 28 2004 b) June 30 2004 c) June 15 2004 d) June 30 2004 e) November 30 2004 f) October 31 2004 g) March 31 2005 Shenton Park Campus: a) March 30 2004 b) April 30 2005 c) July 31 2004 d) July 14 2004 e) July 31 2004 (6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
Royal Perth Hospital: Shenton Park Campus a) Refurbishment of Ward X1 (Spinal Unit) b) Refurbishment of Ward X (Orthopaedics) c) Relocation/refurbishment of Spinal Gymnasium d) Relocation/refurbishment of Joint Replacement Assessment Clinic e) Refurbishment of Wards 7/9 Pantry (5) Expected Completion Dates: Wellington Street Campus: a) May 28 2004 b) June 30 2004 c) June 15 2004 d) June 30 2004 e) November 30 2004 f) October 31 2004 g) March 31 2005 Shenton Park Campus: a) March 30 2004 b) April 30 2005 c) July 31 2004 d) July 14 2004 e) July 31 2004 (6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(5) Expected Completion Dates: Wellington Street Campus: a) May 28 2004 b) June 30 2004 c) June 15 2004 d) June 30 2004 e) November 30 2004 f) October 31 2004 g) March 31 2005 Shenton Park Campus: a) March 30 2004 b) April 30 2005 c) July 31 2004 d) July 14 2004 e) July 31 2004 (6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
Shenton Park Campus: a) March 30 2004 b) April 30 2005 c) July 31 2004 d) July 14 2004 e) July 31 2004 (6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(6) Works currently approved within this allocation are: Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
Estimated Cost Completion Due Broome CT Scanner Installation $1.7m May 2005 Derby Aged Care Development $4.79m July 2006 Derby Hospital Redevelopment $11.59m February 2007 Halls Creek Hospital $8.75m May 2005 Halls Creek Staff Accommodation $0.47m January 2005 Kununurra Hospital Aged Care Additions $2.0m September 2004 Kununurra Staff Accommodation $0.7m May 2005 (7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(7) See Question 6. (8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(8) Portion of Lot 60 Milldale Way, Mirrabooka (2.5Ha) – This land will be utilised for the development of future community-based health services. Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
Lot 1 (portion of Reserve 382872) Cecil Avenue, Cannington (2.5Ha) – this land will be utilised for the development of future community-based health services. (9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(9) The carryovers allocation is a contingency item created to enable projects with small amounts outstanding to be listed as closed. When outstanding bills are received they are charged to this allocation. (10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(10) Not applicable. (11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(11) Works include amalgamation of ward areas, provision of day surgery area and provision of space for mental health. Project completion programmed for April 2005. (12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(12) Project completion programmed for July 2006. (13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(13) Project completion programmed for March 2006. (14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(14) Project completion programmed for June 2005. (15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(15) Community consultation for planning of an integrated multipurpose centre is proceeding and a completion date is yet to be determined. (16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(16) Funding provided will be used to maintain the existing hospital facility. Works are programmed for completion by December 2006. (17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(17) Project completion programmed for June 2005. (18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(18) Planning to implement infrastructure recommendations made by the Health Reform Committee. (19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(19) This allocation provides funds to progressively undertake works as they are identified. (20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(20) Not applicable. (21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(21) Broome Hospital will be substantially redeveloped to become a Regional Resource Centre for the Kimberley. The works will require staging with the Stage 1 project programmed for completion in 2009/10. (22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(22) A prioritised program is currently being developed. (23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(23) Not applicable. (24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(24) Project completion programmed for October 2005. (25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(25) The works will include enhancement of existing services at Kununurra by redevelopment of the existing hospital and provision of new facilities at Wyndham. The project is programmed for completion late 2007. (26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(26) Project completion programmed for August 2005. (27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(27) Project completion programmed for Stage 1 for June 2007 and for Stage 2 for June 2012. (28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(28) Government has accepted the Committee’s recommendation that there should be a new major tertiary hospital constructed to service the south of Perth. The Health Reform Committee’s preferred location is at Murdoch, however, the final location is still to be decided. The Department of Health is currently considering the future location of the new Southern Tertiary Hospital. (29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(29) 2012. (30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(30) These funds have been allocated for the design, implementation, and “roll-in” of the Health Shared Service Centre. In conjunction with this, the funds will be used for the design, build and implementation of new Corporate Systems across Health. In addition, the structure of the new centre will be designed and established within the same time frame. (31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(31) The majority of the project will be completed in the 2004/05 financial year, with the final “roll-in” of functions in 2005/06. The expected completion date is 31 December 2006. (32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(32) Refer to answer for (30). (33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(33) Refer to answer for (31). (34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(34) Information and Communication Equipment and Infrastructure refer to multiple clinical information systems and the technical infrastructure required to support these systems. In the financial year 2004/05 the initial work undertaken will be in the form of refinement of requirements, business case development, and preparation of technical specifications for procurement. Electronic clinical information tools and services will be provided that directly support clinicians in patient care in both hospital and community care settings consistent with the recommendations of the Health Reform Committee report. Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
Once replacement systems have been identified the appropriate infrastructure to support the functional requirements will be purchased and implemented. An estimated $70 million is planned for investment in the first four years with $7.5 million identified in the first year of planning. Budget Allocation 2004/05 $7.5m 2005/06 $15m 2006/07 $22.5m 2007/08 $25m 2008/09 $25m 2009/10 $25m 2010/11 $30m 2011/12 $35m 2012/13 $35m 2013/14 $35m C/over $80m (35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(35) The work involved under the heading Information and Communication Equipment and Infrastructure forms part of the Department of Health’s rolling 10-year capital budget plan representing a portfolio approach to information systems development. Therefore the timeframe includes the financial years 2004/05 to 2013/14, subject to planning and acquisition confirmation. Rollout of clinical information systems to both rural and metropolitan health services will be progressive over the investment period. (36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(36) A prioritised program is currently being developed. (37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(37) Not applicable. (38) A prioritised program is currently being developed. (39) Not applicable.
(38) A prioritised program is currently being developed. (39) Not applicable.
(39) Not applicable.