In reference to the current infill sewerage program in Port Hedland, will the Minister advise
(a) what are the criteria for deciding the best points of entry for the sewerage line to each property;
(b) does the Water Corporation make every effort to accommodate existing structures on each property;
(c) when the Water Corporation and the property owner are in disagreement over the point of entry, who determines the costs to the owner for alternative entry points;
(d) does the Minister consider a charge of $46.00 per centimetre to be reasonable;
(e) can the Minister explain why the private contractors include an additional cost of 15 per cent payable to Water Corporation in their quotes for work; and
(f) what does the property owner get from Water Corporation for that 15 per cent surcharge?
(a) what are the criteria for deciding the best points of entry for the sewerage line to each property;
(b) does the Water Corporation make every effort to accommodate existing structures on each property;
(c) when the Water Corporation and the property owner are in disagreement over the point of entry, who determines the costs to the owner for alternative entry points;
(d) does the Minister consider a charge of $46.00 per centimetre to be reasonable;
(e) can the Minister explain why the private contractors include an additional cost of 15 per cent payable to Water Corporation in their quotes for work; and
(f) what does the property owner get from Water Corporation for that 15 per cent surcharge?
AnswerView source ↗
Answered
1 May 2012
Responded by
Minister for Water
Response time
34 days
(a) The key criterion for deciding the best point of entry is the lowest point of the block that is to be serviced. This low point ensures that the property connection can receive wastewater flows by gravity for current and future developments on the property.
(b) All property owners have the opportunity to discuss the location of their service with the Water Corporation during the Preliminaries to Works process and during the Contract Works period. The location of the property connection can be moved in recognition of existing structures and other obstacles following consultation with the property owner.
(c) The cost is provided by the Contractor undertaking the Works. The Water Corporation will determine a reasonable cost to the property owner.
(d) A charge of $46.00 per centimetre is not considered to be reasonable. To date, the only quote formally given to a property owner in Port Hedland is $2760.23 for a 6 metre extension, which equates to $4.60 per centimetre. This rate is considered reasonable for work of this type.
(e) The 15 per cent cost payable to the Water Corporation is the standard overhead that applies to any additional works that a Contractor is requested to undertake for a property owner.
(f) The 15 per cent surcharge covers site supervision, design modification costs, and general administration associated with processing additional work.
Notice: This document is created or edited using unregistered or evaluation copy of rtLib valid for testing or development purposes only. To use it for productive or any other purposes please register it. You may purchase the license on
http://www.rtlib.com
(b) All property owners have the opportunity to discuss the location of their service with the Water Corporation during the Preliminaries to Works process and during the Contract Works period. The location of the property connection can be moved in recognition of existing structures and other obstacles following consultation with the property owner.
(c) The cost is provided by the Contractor undertaking the Works. The Water Corporation will determine a reasonable cost to the property owner.
(d) A charge of $46.00 per centimetre is not considered to be reasonable. To date, the only quote formally given to a property owner in Port Hedland is $2760.23 for a 6 metre extension, which equates to $4.60 per centimetre. This rate is considered reasonable for work of this type.
(e) The 15 per cent cost payable to the Water Corporation is the standard overhead that applies to any additional works that a Contractor is requested to undertake for a property owner.
(f) The 15 per cent surcharge covers site supervision, design modification costs, and general administration associated with processing additional work.
Notice: This document is created or edited using unregistered or evaluation copy of rtLib valid for testing or development purposes only. To use it for productive or any other purposes please register it. You may purchase the license on
http://www.rtlib.com
Explore WA Government Data
Search the full archive in the free dashboard, or query programmatically via API.
Explore more
Government Gazette
Appointments, regulatory notices, planning changes.
Hansard
Debates, questions, speeches and sentiment.
Tabled Papers
Reports and documents tabled in Parliament.
Committees
Committee profiles and recent reports.
Regulations
Subsidiary legislation with filters and summaries.
Bills
Proposed laws and parliamentary progress.
Acts
Current WA legislation and summaries.
Explanatory Memoranda
Bills with EMs (text/PDF) available.
Members
MP profiles, party breakdown and rankings.
Pollie Rankings
Data-driven rankings across 19 categories.
Amendment Chains
Track how schemes and regulations evolve over time.