(1) Since the election of the State Labor Government how many reviews, committees, inquiries and taskforces have been established in the Minister’s portfolio?
(2) Will the Minister list the reviews, committees, inquiries and taskforces that have been established?
(3) Will the Minister list the commencement date and the completion date for each review, committee, inquiry and taskforce?

AnswerView source ↗

Answered
11 June 2002
Responded by
Minister representing the Minister for Housing and Works; Local Government and Regional Development; the Kimberley, Pilbara and Gascoyne
Response time
90 days
1. Two 2. (a) North West Airservices Taskforce (b) Kimberley Aviation Tourism Development Committee 3. (a) Commenced 6 August 2001, completion date not specified. (b) Commenced 19 December 2001, completion date not specified. Pilbara Development Commission (1) Three. (2) (i) The Nickol Bay Accommodation and Associated Issues Taskforce. (ii) Onslow Strategic Development Taskforce. (iii) Roebourne Enhancement Government Agency Interim Committee. (3) (i) The Nickol Bay Accommodation and Associated Issues Taskforce first met on 14 August 2001. The terms of reference for the Taskforce are ongoing. (ii) The Onslow Strategic Development Taskforce was created on 7 June 2001. The Taskforce has a four-year lifespan and is scheduled for completion on 30 June 2005. (iii) The Roebourne Enhancement Government Agency Interim Committee first met on 6 November 2001. The Committee has a four-year lifespan and is scheduled for completion on 31 December 2005. Gascoyne Development Commission (1) The Coral Bay Infrastructure Implementation Working Group was formed to oversee the development of infrastructure by government agencies in Coral Bay. (2) As above (3) The Coral Bay Infrastructure Implementation Working Group (CBIIWG) was established in May 2001 with its completion date to depend on progress made. Prior to this date the Coral Bay Infrastructure Working Group (CBIWG) existed. The date first meeting held by this group was 17 February 1997. The Coral Bay Taskforce submitted its recommendations in November 1996. Department of Housing and Works (1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
2. (a) North West Airservices Taskforce (b) Kimberley Aviation Tourism Development Committee 3. (a) Commenced 6 August 2001, completion date not specified. (b) Commenced 19 December 2001, completion date not specified. Pilbara Development Commission (1) Three. (2) (i) The Nickol Bay Accommodation and Associated Issues Taskforce. (ii) Onslow Strategic Development Taskforce. (iii) Roebourne Enhancement Government Agency Interim Committee. (3) (i) The Nickol Bay Accommodation and Associated Issues Taskforce first met on 14 August 2001. The terms of reference for the Taskforce are ongoing. (ii) The Onslow Strategic Development Taskforce was created on 7 June 2001. The Taskforce has a four-year lifespan and is scheduled for completion on 30 June 2005. (iii) The Roebourne Enhancement Government Agency Interim Committee first met on 6 November 2001. The Committee has a four-year lifespan and is scheduled for completion on 31 December 2005. Gascoyne Development Commission (1) The Coral Bay Infrastructure Implementation Working Group was formed to oversee the development of infrastructure by government agencies in Coral Bay. (2) As above (3) The Coral Bay Infrastructure Implementation Working Group (CBIIWG) was established in May 2001 with its completion date to depend on progress made. Prior to this date the Coral Bay Infrastructure Working Group (CBIWG) existed. The date first meeting held by this group was 17 February 1997. The Coral Bay Taskforce submitted its recommendations in November 1996. Department of Housing and Works (1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
3. (a) Commenced 6 August 2001, completion date not specified. (b) Commenced 19 December 2001, completion date not specified. Pilbara Development Commission (1) Three. (2) (i) The Nickol Bay Accommodation and Associated Issues Taskforce. (ii) Onslow Strategic Development Taskforce. (iii) Roebourne Enhancement Government Agency Interim Committee. (3) (i) The Nickol Bay Accommodation and Associated Issues Taskforce first met on 14 August 2001. The terms of reference for the Taskforce are ongoing. (ii) The Onslow Strategic Development Taskforce was created on 7 June 2001. The Taskforce has a four-year lifespan and is scheduled for completion on 30 June 2005. (iii) The Roebourne Enhancement Government Agency Interim Committee first met on 6 November 2001. The Committee has a four-year lifespan and is scheduled for completion on 31 December 2005. Gascoyne Development Commission (1) The Coral Bay Infrastructure Implementation Working Group was formed to oversee the development of infrastructure by government agencies in Coral Bay. (2) As above (3) The Coral Bay Infrastructure Implementation Working Group (CBIIWG) was established in May 2001 with its completion date to depend on progress made. Prior to this date the Coral Bay Infrastructure Working Group (CBIWG) existed. The date first meeting held by this group was 17 February 1997. The Coral Bay Taskforce submitted its recommendations in November 1996. Department of Housing and Works (1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
Pilbara Development Commission (1) Three. (2) (i) The Nickol Bay Accommodation and Associated Issues Taskforce. (ii) Onslow Strategic Development Taskforce. (iii) Roebourne Enhancement Government Agency Interim Committee. (3) (i) The Nickol Bay Accommodation and Associated Issues Taskforce first met on 14 August 2001. The terms of reference for the Taskforce are ongoing. (ii) The Onslow Strategic Development Taskforce was created on 7 June 2001. The Taskforce has a four-year lifespan and is scheduled for completion on 30 June 2005. (iii) The Roebourne Enhancement Government Agency Interim Committee first met on 6 November 2001. The Committee has a four-year lifespan and is scheduled for completion on 31 December 2005. Gascoyne Development Commission (1) The Coral Bay Infrastructure Implementation Working Group was formed to oversee the development of infrastructure by government agencies in Coral Bay. (2) As above (3) The Coral Bay Infrastructure Implementation Working Group (CBIIWG) was established in May 2001 with its completion date to depend on progress made. Prior to this date the Coral Bay Infrastructure Working Group (CBIWG) existed. The date first meeting held by this group was 17 February 1997. The Coral Bay Taskforce submitted its recommendations in November 1996. Department of Housing and Works (1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(1) Three. (2) (i) The Nickol Bay Accommodation and Associated Issues Taskforce. (ii) Onslow Strategic Development Taskforce. (iii) Roebourne Enhancement Government Agency Interim Committee. (3) (i) The Nickol Bay Accommodation and Associated Issues Taskforce first met on 14 August 2001. The terms of reference for the Taskforce are ongoing. (ii) The Onslow Strategic Development Taskforce was created on 7 June 2001. The Taskforce has a four-year lifespan and is scheduled for completion on 30 June 2005. (iii) The Roebourne Enhancement Government Agency Interim Committee first met on 6 November 2001. The Committee has a four-year lifespan and is scheduled for completion on 31 December 2005. Gascoyne Development Commission (1) The Coral Bay Infrastructure Implementation Working Group was formed to oversee the development of infrastructure by government agencies in Coral Bay. (2) As above (3) The Coral Bay Infrastructure Implementation Working Group (CBIIWG) was established in May 2001 with its completion date to depend on progress made. Prior to this date the Coral Bay Infrastructure Working Group (CBIWG) existed. The date first meeting held by this group was 17 February 1997. The Coral Bay Taskforce submitted its recommendations in November 1996. Department of Housing and Works (1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(2) (i) The Nickol Bay Accommodation and Associated Issues Taskforce. (ii) Onslow Strategic Development Taskforce. (iii) Roebourne Enhancement Government Agency Interim Committee. (3) (i) The Nickol Bay Accommodation and Associated Issues Taskforce first met on 14 August 2001. The terms of reference for the Taskforce are ongoing. (ii) The Onslow Strategic Development Taskforce was created on 7 June 2001. The Taskforce has a four-year lifespan and is scheduled for completion on 30 June 2005. (iii) The Roebourne Enhancement Government Agency Interim Committee first met on 6 November 2001. The Committee has a four-year lifespan and is scheduled for completion on 31 December 2005. Gascoyne Development Commission (1) The Coral Bay Infrastructure Implementation Working Group was formed to oversee the development of infrastructure by government agencies in Coral Bay. (2) As above (3) The Coral Bay Infrastructure Implementation Working Group (CBIIWG) was established in May 2001 with its completion date to depend on progress made. Prior to this date the Coral Bay Infrastructure Working Group (CBIWG) existed. The date first meeting held by this group was 17 February 1997. The Coral Bay Taskforce submitted its recommendations in November 1996. Department of Housing and Works (1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(3) (i) The Nickol Bay Accommodation and Associated Issues Taskforce first met on 14 August 2001. The terms of reference for the Taskforce are ongoing. (ii) The Onslow Strategic Development Taskforce was created on 7 June 2001. The Taskforce has a four-year lifespan and is scheduled for completion on 30 June 2005. (iii) The Roebourne Enhancement Government Agency Interim Committee first met on 6 November 2001. The Committee has a four-year lifespan and is scheduled for completion on 31 December 2005. Gascoyne Development Commission (1) The Coral Bay Infrastructure Implementation Working Group was formed to oversee the development of infrastructure by government agencies in Coral Bay. (2) As above (3) The Coral Bay Infrastructure Implementation Working Group (CBIIWG) was established in May 2001 with its completion date to depend on progress made. Prior to this date the Coral Bay Infrastructure Working Group (CBIWG) existed. The date first meeting held by this group was 17 February 1997. The Coral Bay Taskforce submitted its recommendations in November 1996. Department of Housing and Works (1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
Gascoyne Development Commission (1) The Coral Bay Infrastructure Implementation Working Group was formed to oversee the development of infrastructure by government agencies in Coral Bay. (2) As above (3) The Coral Bay Infrastructure Implementation Working Group (CBIIWG) was established in May 2001 with its completion date to depend on progress made. Prior to this date the Coral Bay Infrastructure Working Group (CBIWG) existed. The date first meeting held by this group was 17 February 1997. The Coral Bay Taskforce submitted its recommendations in November 1996. Department of Housing and Works (1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(1) The Coral Bay Infrastructure Implementation Working Group was formed to oversee the development of infrastructure by government agencies in Coral Bay. (2) As above (3) The Coral Bay Infrastructure Implementation Working Group (CBIIWG) was established in May 2001 with its completion date to depend on progress made. Prior to this date the Coral Bay Infrastructure Working Group (CBIWG) existed. The date first meeting held by this group was 17 February 1997. The Coral Bay Taskforce submitted its recommendations in November 1996. Department of Housing and Works (1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(2) As above (3) The Coral Bay Infrastructure Implementation Working Group (CBIIWG) was established in May 2001 with its completion date to depend on progress made. Prior to this date the Coral Bay Infrastructure Working Group (CBIWG) existed. The date first meeting held by this group was 17 February 1997. The Coral Bay Taskforce submitted its recommendations in November 1996. Department of Housing and Works (1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(3) The Coral Bay Infrastructure Implementation Working Group (CBIIWG) was established in May 2001 with its completion date to depend on progress made. Prior to this date the Coral Bay Infrastructure Working Group (CBIWG) existed. The date first meeting held by this group was 17 February 1997. The Coral Bay Taskforce submitted its recommendations in November 1996. Department of Housing and Works (1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
Department of Housing and Works (1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(1) Eight (2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(2) (i) Review of “The Agreement for the Provision of Housing and Related Infrastructure for Aboriginal and Torres Strait Islander People in Western Australia; (ii) Review of “Parnpajinya Housing Development Project – Community Development Strategy” Remote Area Development Group; (iii) Halls Creek Housing Taskforce (iv) Independent Review Committee to review the circumstances of ineligible tenants; (v) State Homelessness Taskforce; (vi) Old Treasury Buildings Working Party; (vii) The Pyrton Working Party; (viii) The Perth Convention and Exhibition Centre Taskforce has been transferred to the Minister’s areas of portfolio responsibility; (3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(3) (i) Commenced on 7 March 2001 and was finalised on 27 June 2001 (ii) Commenced in July 2001 and was finalised in March 2002 (iii) Commenced in April 2001 and is ongoing (iv) Commenced on 6 February 2002 and is ongoing (v) Commenced on 23 July 2001 and was finalised on 1 February 2002 (vi) Commenced on 11 July 2001 and is ongoing (vii) Commenced on 10 January 2002 and is ongoing (viii) Commenced its work during the period of the previous Government and will complete its work following the commissioning of the Perth Convention and Exhibition Centre. Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
Department of Local Government and Regional Development (1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(1) Six This response does not include inquiries into Local Government Authorities that are undertaken by the Department in its monitoring work. (2) i. Working Group on State and Local Government Relations (WGSLGR) ii. Review of the Regional Development Commissions (Statutory Authority Status) iii. Review of the Operation of the Local Government Grants Act 1978 iv. Review of Cemetery Boards v. Review of the Dog Act vi. Review of the Regional Headworks Development Scheme (3) i. Commenced 7 November 2002. The Group is ongoing. ii. Commenced 28 February 2002. To be finalised in April 2002. iii. Commenced – Ministerial Press Release 15 February 2002. To be finalised with a report to the Minister July 2002. iv. Commenced 1 December 2001. To be finalised in April 2002. v. Background work currently underway. Completion date yet to be determined. vi. Background work currently underway. Completion date yet to be determined. State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
State Supply Commission (1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(1) Three (2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(2) Review of the buy Local Policy Review of Statutory Authorities (State Supply Commission) Indemnity and Insurance Clauses Discussion Group (3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
(3) Then Review of the Buy Local Policy was launched in October 2001 and is expected to be completed in April 2002. The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
The Review of Statutory Authorities (State Supply Commission) commenced in February 2002 and is expected to be finalised in May 2002. the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.
the Indemnity and Insurance Clauses Discussion Group commenced in march 2002 and is expected to be completed in April 2002.