❓ Question on Notice regarding capital works expenditure allocated to the electorates of Mindarie, Peel, Rockingham, and Swan Hills in the 2005-06 Budget. The Treasurer provides a detailed breakdown of expenditure by department and specific projects for each electorate.
AnsweredQoN 1899Legislative Assembly
QuestionView source ↗
(a) Mindarie; (b) Peel; (c) Rockingham; and (d) Swan Hills?
(b) Peel; (c) Rockingham; and (d) Swan Hills?
(c) Rockingham; and (d) Swan Hills?
(d) Swan Hills?
Department of Education and Training · Continuation of works on Stage 2 of Kinross College ($3.4 million); · Commencement of Stage 2 works at the Mindarie Senior College ($500,000); and · Commencement of works for the new Tapping Primary School ($700,000). Western Power · Establishment of a new substation at Clarkson ($2.949 million); and · Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Continuation of works on Stage 2 of Kinross College ($3.4 million); · Commencement of Stage 2 works at the Mindarie Senior College ($500,000); and · Commencement of works for the new Tapping Primary School ($700,000). Western Power · Establishment of a new substation at Clarkson ($2.949 million); and · Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Commencement of Stage 2 works at the Mindarie Senior College ($500,000); and · Commencement of works for the new Tapping Primary School ($700,000). Western Power · Establishment of a new substation at Clarkson ($2.949 million); and · Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Commencement of works for the new Tapping Primary School ($700,000). Western Power · Establishment of a new substation at Clarkson ($2.949 million); and · Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Western Power · Establishment of a new substation at Clarkson ($2.949 million); and · Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Establishment of a new substation at Clarkson ($2.949 million); and · Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
(b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
(c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
(d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
(b) Peel; (c) Rockingham; and (d) Swan Hills?
(c) Rockingham; and (d) Swan Hills?
(d) Swan Hills?
Department of Education and Training · Continuation of works on Stage 2 of Kinross College ($3.4 million); · Commencement of Stage 2 works at the Mindarie Senior College ($500,000); and · Commencement of works for the new Tapping Primary School ($700,000). Western Power · Establishment of a new substation at Clarkson ($2.949 million); and · Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Continuation of works on Stage 2 of Kinross College ($3.4 million); · Commencement of Stage 2 works at the Mindarie Senior College ($500,000); and · Commencement of works for the new Tapping Primary School ($700,000). Western Power · Establishment of a new substation at Clarkson ($2.949 million); and · Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Commencement of Stage 2 works at the Mindarie Senior College ($500,000); and · Commencement of works for the new Tapping Primary School ($700,000). Western Power · Establishment of a new substation at Clarkson ($2.949 million); and · Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Commencement of works for the new Tapping Primary School ($700,000). Western Power · Establishment of a new substation at Clarkson ($2.949 million); and · Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Western Power · Establishment of a new substation at Clarkson ($2.949 million); and · Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Establishment of a new substation at Clarkson ($2.949 million); and · Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Continuation of works on the Clarkson substation integration ($600,000). Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Commissioner of Main Roads · Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million). (b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
(b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows: Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Education and Training · Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Continuation of works on Comet Bay College ($12.0 million); · Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Completion of works on a new Primary School in Secret Harbour ($5.426 million); and · Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000). Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Health · Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million). Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Metropolitan Cemetery Board · Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Maintenance works at the Rockingham Regional Memorial Park ($300,000). Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Sport and Recreation · Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund). (c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
(c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows: Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Public Transport Authority of Western Australia · Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million). Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Water Corporation · Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million). Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Western Power · Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Site acquisition and distribution works on the Waikiki substation ($1.806 million); and · Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Other transmission works in Rockingham ($147,000). Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Sport and Recreation · Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund). Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Conservation and Land Management · Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Erosion control measures at Penguin Island ($250,000). (d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
(d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows: Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Commissioner of Main Roads · Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million); · Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million); · Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and · Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Construction of passing lanes on Toodyay Road ($2.5 million). Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Conservation and Land Management · Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Improvements to Gnangara Park ($200,000). Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Education and Training · Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Additions and improvements to Bullsbrook District High School ($2.0 million); · Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Completion of a new music room at Eastern Hills Senior High School ($1.9 million); · Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and · Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Commencement of construction of the new Ellenbrook High School ($12.0 million). Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Justice · Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison. Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Western Australia Police · Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Continuation of the construction of the new Ellenbrook Police Station ($600,000). Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Water Corporation · Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million). Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Western Australian Planning Commission · Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Works at the Swan/Helena Regional Park ($500,000). Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Western Power · Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million). Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Sport and Recreation · Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund); · Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
· Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
AnswerView source ↗
Answered
3 April 2007
Response time
14 days
(a) Capital Works expenditure totalling $10.149 million was allocated to the electorate of Mindarie in the 2005-06 Budget. Details are as follows:
Department of Education and Training
· Continuation of works on Stage 2 of Kinross College ($3.4 million);
· Commencement of Stage 2 works at the Mindarie Senior College ($500,000); and
· Commencement of works for the new Tapping Primary School ($700,000).
Western Power
· Establishment of a new substation at Clarkson ($2.949 million); and
· Continuation of works on the Clarkson substation integration ($600,000).
Commissioner of Main Roads
· Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million).
(b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows:
Department of Education and Training
· Continuation of works on Comet Bay College ($12.0 million);
· Completion of works on a new Primary School in Secret Harbour ($5.426 million); and
· Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000).
Department of Health
· Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million).
Metropolitan Cemetery Board
· Maintenance works at the Rockingham Regional Memorial Park ($300,000).
Department of Sport and Recreation
· Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund).
(c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows:
Public Transport Authority of Western Australia
· Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million).
Water Corporation
· Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million).
Western Power
· Site acquisition and distribution works on the Waikiki substation ($1.806 million); and
· Other transmission works in Rockingham ($147,000).
Department of Sport and Recreation
· Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund).
Department of Conservation and Land Management
· Erosion control measures at Penguin Island ($250,000).
(d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows:
Commissioner of Main Roads
· Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million);
· Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million);
· Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and
· Construction of passing lanes on Toodyay Road ($2.5 million).
Department of Conservation and Land Management
· Improvements to Gnangara Park ($200,000).
Department of Education and Training
· Additions and improvements to Bullsbrook District High School ($2.0 million);
· Completion of a new music room at Eastern Hills Senior High School ($1.9 million);
· Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and
· Commencement of construction of the new Ellenbrook High School ($12.0 million).
Department of Justice
· Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison.
Western Australia Police
· Continuation of the construction of the new Ellenbrook Police Station ($600,000).
Water Corporation
· Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million).
Western Australian Planning Commission
· Works at the Swan/Helena Regional Park ($500,000).
Western Power
· Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million).
Department of Sport and Recreation
· Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund);
· Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund);
· Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and
Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Department of Education and Training
· Continuation of works on Stage 2 of Kinross College ($3.4 million);
· Commencement of Stage 2 works at the Mindarie Senior College ($500,000); and
· Commencement of works for the new Tapping Primary School ($700,000).
Western Power
· Establishment of a new substation at Clarkson ($2.949 million); and
· Continuation of works on the Clarkson substation integration ($600,000).
Commissioner of Main Roads
· Commencement of works on further extension of the Mitchell Freeway from Shenton Avenue to Burns Beach Road ($2.0 million).
(b) Capital Works expenditure totalling $21.761 million was allocated to the electorate of Peel in the 2005-06 Budget. Details are as follows:
Department of Education and Training
· Continuation of works on Comet Bay College ($12.0 million);
· Completion of works on a new Primary School in Secret Harbour ($5.426 million); and
· Completion of a new primary school in Settlers Hill ($725,000) and commencement of the construction of a second primary school in the area ($275,000).
Department of Health
· Continuation of works on Stage 1 redevelopment of Rockingham Kwinana Hospital ($3.0 million).
Metropolitan Cemetery Board
· Maintenance works at the Rockingham Regional Memorial Park ($300,000).
Department of Sport and Recreation
· Contribution towards the extension of the club house and ablution block at the Warnbro Bowling Club ($35,000 from the Community Sporting and Recreation Facilities Fund).
(c) Capital Works expenditure totalling $28.118 million was allocated to the electorate of Rockingham in the 2005-06 Budget. Details are as follows:
Public Transport Authority of Western Australia
· Expenditure associated with the Rockingham Central City Transit System, a high frequency bus link between the new Rockingham Train Station and the Rockingham Foreshore ($9.8 million).
Water Corporation
· Commencement of the construction of the East Rockingham Wastewater Scheme ($16.1 million).
Western Power
· Site acquisition and distribution works on the Waikiki substation ($1.806 million); and
· Other transmission works in Rockingham ($147,000).
Department of Sport and Recreation
· Contribution towards resurfacing of courts and installation/upgrade of floodlighting at the Safety Bay Tennis Club ($15,267 from the Community Sporting and Recreation Facilities Fund).
Department of Conservation and Land Management
· Erosion control measures at Penguin Island ($250,000).
(d) Capital Works expenditure totalling $49.123 million was allocated to the electorate of Swan Hills in the 2005-06 Budget. Details are as follows:
Commissioner of Main Roads
· Construction of the Clackline Bypass on Great Eastern Highway ($3.4 million);
· Continuation of works on the reconstruction and widening of Great Northern Highway from Roe Highway to Muchea ($6.324 million);
· Duplication of Middle Swan Road (Reid Highway) from West Swan Road to Great Northern Highway ($1.5 million); and
· Construction of passing lanes on Toodyay Road ($2.5 million).
Department of Conservation and Land Management
· Improvements to Gnangara Park ($200,000).
Department of Education and Training
· Additions and improvements to Bullsbrook District High School ($2.0 million);
· Completion of a new music room at Eastern Hills Senior High School ($1.9 million);
· Additions and improvements to Mount Helena and Upper Swan Primary Schools ($200,000 each); and
· Commencement of construction of the new Ellenbrook High School ($12.0 million).
Department of Justice
· Conversion of existing buildings and the construction of new buildings to provide additional minimum security accommodation capacity ($2.849 million) and the construction of perimeter fencing, detection, cameras, lighting and a response capacity around the accommodation units to improve security ($5.5 million) at Wooroloo Prison.
Western Australia Police
· Continuation of the construction of the new Ellenbrook Police Station ($600,000).
Water Corporation
· Works in the Hills area including a new 50 megalitre water tank in Sawyers Valley ($7.4 million).
Western Australian Planning Commission
· Works at the Swan/Helena Regional Park ($500,000).
Western Power
· Works in the local area including works on the establishment of a new substation at Henley Brook ($2.05 million).
Department of Sport and Recreation
· Contribution towards the construction of 300 steel horse yards at the State Equestrian Centre ($25,000 from the Community Sporting and Recreation Facilities Fund);
· Contribution towards the construction of an evening training and competition course at the State Equestrian Centre ($45,000 from the Community Sporting and Recreation Facilities Fund);
· Contribution towards the construction of two multi-purpose courts at the Percy Cullen Oval in Gidgegannup ($41,800 from the Community Sporting and Recreation Facilities Fund); and
Contribution towards the installation of a synthetic bowling green for the Mundaring Sporting Club ($46,500 from the Community Sporting and Recreation Facilities Fund).
Explore WA Government Data
Search the full archive in the free dashboard, or query programmatically via API.
Explore more
Government Gazette
Appointments, regulatory notices, planning changes.
Hansard
Debates, questions, speeches and sentiment.
Tabled Papers
Reports and documents tabled in Parliament.
Committees
Committee profiles and recent reports.
Regulations
Subsidiary legislation with filters and summaries.
Bills
Proposed laws and parliamentary progress.
Acts
Current WA legislation and summaries.
Explanatory Memoranda
Bills with EMs (text/PDF) available.
Members
MP profiles, party breakdown and rankings.
Pollie Rankings
Data-driven rankings across 19 categories.
Amendment Chains
Track how schemes and regulations evolve over time.