❓ A WA parliamentary question on notice regarding the infill sewerage program in the South West region. The Hon Adele Farina questions the currency of tabled maps and seeks clarification on sewered areas and future projects, to which Hon Helen Morton responds.
AnsweredQoN 634Legislative Council
QuestionView source ↗
INFILL SEWERAGE PROGRAM — SOUTH WEST REGION
I refer to the minister’s answer to my question on notice concerning the infill sewerage program for the South West Region asked during the estimates hearings, and the tabled maps. (1) Is the minister aware that the tabled maps are dated 2004-05, and detail the infill sewerage program for 2004–05 to 2006-07? (2) Are more current maps available, and will the minister table the current maps? (3) In relation to the tabled maps, how much of the areas have been sewered that are marked as works commencing 2004–05; works commencing 2005-06; works commencing 2006-07; and areas that may be sewered under the infill sewerage program? (4) Will the minister confirm that the only areas in the south west to be sewered in the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A? (5) If yes to (4), in what year will each of these works be undertaken? Hon HELEN MORTON
I refer to the minister’s answer to my question on notice concerning the infill sewerage program for the South West Region asked during the estimates hearings, and the tabled maps. (1) Is the minister aware that the tabled maps are dated 2004-05, and detail the infill sewerage program for 2004–05 to 2006-07? (2) Are more current maps available, and will the minister table the current maps? (3) In relation to the tabled maps, how much of the areas have been sewered that are marked as works commencing 2004–05; works commencing 2005-06; works commencing 2006-07; and areas that may be sewered under the infill sewerage program? (4) Will the minister confirm that the only areas in the south west to be sewered in the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A? (5) If yes to (4), in what year will each of these works be undertaken? Hon HELEN MORTON
AnswerView source ↗
I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(1) Is the minister aware that the tabled maps are dated 2004-05, and detail the infill sewerage program for 2004–05 to 2006-07? (2) Are more current maps available, and will the minister table the current maps? (3) In relation to the tabled maps, how much of the areas have been sewered that are marked as works commencing 2004–05; works commencing 2005-06; works commencing 2006-07; and areas that may be sewered under the infill sewerage program? (4) Will the minister confirm that the only areas in the south west to be sewered in the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A? (5) If yes to (4), in what year will each of these works be undertaken? Hon HELEN MORTON replied: I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(2) Are more current maps available, and will the minister table the current maps? (3) In relation to the tabled maps, how much of the areas have been sewered that are marked as works commencing 2004–05; works commencing 2005-06; works commencing 2006-07; and areas that may be sewered under the infill sewerage program? (4) Will the minister confirm that the only areas in the south west to be sewered in the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A? (5) If yes to (4), in what year will each of these works be undertaken? Hon HELEN MORTON replied: I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(3) In relation to the tabled maps, how much of the areas have been sewered that are marked as works commencing 2004–05; works commencing 2005-06; works commencing 2006-07; and areas that may be sewered under the infill sewerage program? (4) Will the minister confirm that the only areas in the south west to be sewered in the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A? (5) If yes to (4), in what year will each of these works be undertaken? Hon HELEN MORTON replied: I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(4) Will the minister confirm that the only areas in the south west to be sewered in the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A? (5) If yes to (4), in what year will each of these works be undertaken? Hon HELEN MORTON replied: I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(5) If yes to (4), in what year will each of these works be undertaken? Hon HELEN MORTON replied: I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
Hon HELEN MORTON replied: I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(5) The timing of construction is subject to approvals and construction contracts yet to be established.
(1) Is the minister aware that the tabled maps are dated 2004-05, and detail the infill sewerage program for 2004–05 to 2006-07? (2) Are more current maps available, and will the minister table the current maps? (3) In relation to the tabled maps, how much of the areas have been sewered that are marked as works commencing 2004–05; works commencing 2005-06; works commencing 2006-07; and areas that may be sewered under the infill sewerage program? (4) Will the minister confirm that the only areas in the south west to be sewered in the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A? (5) If yes to (4), in what year will each of these works be undertaken? Hon HELEN MORTON replied: I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(2) Are more current maps available, and will the minister table the current maps? (3) In relation to the tabled maps, how much of the areas have been sewered that are marked as works commencing 2004–05; works commencing 2005-06; works commencing 2006-07; and areas that may be sewered under the infill sewerage program? (4) Will the minister confirm that the only areas in the south west to be sewered in the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A? (5) If yes to (4), in what year will each of these works be undertaken? Hon HELEN MORTON replied: I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(3) In relation to the tabled maps, how much of the areas have been sewered that are marked as works commencing 2004–05; works commencing 2005-06; works commencing 2006-07; and areas that may be sewered under the infill sewerage program? (4) Will the minister confirm that the only areas in the south west to be sewered in the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A? (5) If yes to (4), in what year will each of these works be undertaken? Hon HELEN MORTON replied: I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(4) Will the minister confirm that the only areas in the south west to be sewered in the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A? (5) If yes to (4), in what year will each of these works be undertaken? Hon HELEN MORTON replied: I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(5) If yes to (4), in what year will each of these works be undertaken? Hon HELEN MORTON replied: I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
Hon HELEN MORTON replied: I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
I thank the honourable member for some notice of this question. (1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(1) Yes. (2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(2) More current maps detailing the current infill sewerage program are not available. (3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(3) The maps that were tabled showed geographical details of the project areas, and the information is still current. There is no programmed work on the maps to be completed in the 2004–2007 period. The Busselton projects in construction in 2005—that is, Busselton 10F and 15B—were completed. No additional work has been completed. (4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(4) The priority areas in the south west region for the next three years are: Bunbury 29F, 46A and 52A; Mt Barker 5C; Bridgetown 1E (Pt2) and 1F; and Busselton 13B and 18A. (5) The timing of construction is subject to approvals and construction contracts yet to be established.
(5) The timing of construction is subject to approvals and construction contracts yet to be established.
Explore WA Government Data
Search the full archive in the free dashboard, or query programmatically via API.
Explore more
Government Gazette
Appointments, regulatory notices, planning changes.
Hansard
Debates, questions, speeches and sentiment.
Tabled Papers
Reports and documents tabled in Parliament.
Committees
Committee profiles and recent reports.
Regulations
Subsidiary legislation with filters and summaries.
Bills
Proposed laws and parliamentary progress.
Acts
Current WA legislation and summaries.
Explanatory Memoranda
Bills with EMs (text/PDF) available.
Members
MP profiles, party breakdown and rankings.
Pollie Rankings
Data-driven rankings across 19 categories.
Amendment Chains
Track how schemes and regulations evolve over time.