❓ Hon Paul Llewellyn questions the Minister for Water Resources regarding a new bore at the Yarragadee Aquifer, specifically concerning landowner notification, consultation, and environmental impact assessments. The Minister provides answers and tables relevant documents.
AnsweredQoN 542Legislative Council
QuestionView source ↗
YARRAGADEE AQUIFER - BORE
I refer to the new bore to take 1.5 gigalitres of water from the Yarragadee at Nelson, near Nannup. (1) The Water Corporation claims to have sent all landowners in the vicinity of the aforementioned bore a letter advising of the work. Landowners claim that this is not the case. Will the minister provide - (a) a copy of the letter; (b) a list of those people it was sent to; and (c) the dates the letter was written and sent? (2) If no to (1), why not? (3) The Water Corporation claims that its project team has worked one-on-one with landowners close to the proposed bore. Landowners claim that this is not the case. Will the minister provide a list of the landowners the Water Corporation has worked with? (4) If no to (3), why not? (5) Will the minister table the detailed hydrogeological modelling environmental assessment the Water Corporation claims to exist to prove that the bore will not have any negative effect on the environment? (6) If no to (5), why not? Hon KIM CHANCE
I refer to the new bore to take 1.5 gigalitres of water from the Yarragadee at Nelson, near Nannup. (1) The Water Corporation claims to have sent all landowners in the vicinity of the aforementioned bore a letter advising of the work. Landowners claim that this is not the case. Will the minister provide - (a) a copy of the letter; (b) a list of those people it was sent to; and (c) the dates the letter was written and sent? (2) If no to (1), why not? (3) The Water Corporation claims that its project team has worked one-on-one with landowners close to the proposed bore. Landowners claim that this is not the case. Will the minister provide a list of the landowners the Water Corporation has worked with? (4) If no to (3), why not? (5) Will the minister table the detailed hydrogeological modelling environmental assessment the Water Corporation claims to exist to prove that the bore will not have any negative effect on the environment? (6) If no to (5), why not? Hon KIM CHANCE
AnswerView source ↗
I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(1) The Water Corporation claims to have sent all landowners in the vicinity of the aforementioned bore a letter advising of the work. Landowners claim that this is not the case. Will the minister provide - (a) a copy of the letter; (b) a list of those people it was sent to; and (c) the dates the letter was written and sent? (2) If no to (1), why not? (3) The Water Corporation claims that its project team has worked one-on-one with landowners close to the proposed bore. Landowners claim that this is not the case. Will the minister provide a list of the landowners the Water Corporation has worked with? (4) If no to (3), why not? (5) Will the minister table the detailed hydrogeological modelling environmental assessment the Water Corporation claims to exist to prove that the bore will not have any negative effect on the environment? (6) If no to (5), why not? Hon KIM CHANCE replied: I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(b) a list of those people it was sent to; and (c) the dates the letter was written and sent?
(c) the dates the letter was written and sent?
(3) The Water Corporation claims that its project team has worked one-on-one with landowners close to the proposed bore. Landowners claim that this is not the case. Will the minister provide a list of the landowners the Water Corporation has worked with? (4) If no to (3), why not? (5) Will the minister table the detailed hydrogeological modelling environmental assessment the Water Corporation claims to exist to prove that the bore will not have any negative effect on the environment? (6) If no to (5), why not? Hon KIM CHANCE replied: I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(4) If no to (3), why not? (5) Will the minister table the detailed hydrogeological modelling environmental assessment the Water Corporation claims to exist to prove that the bore will not have any negative effect on the environment? (6) If no to (5), why not? Hon KIM CHANCE replied: I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(5) Will the minister table the detailed hydrogeological modelling environmental assessment the Water Corporation claims to exist to prove that the bore will not have any negative effect on the environment? (6) If no to (5), why not? Hon KIM CHANCE replied: I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(6) If no to (5), why not? Hon KIM CHANCE replied: I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
Hon KIM CHANCE replied: I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
[See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(1) The Water Corporation claims to have sent all landowners in the vicinity of the aforementioned bore a letter advising of the work. Landowners claim that this is not the case. Will the minister provide - (a) a copy of the letter; (b) a list of those people it was sent to; and (c) the dates the letter was written and sent? (2) If no to (1), why not? (3) The Water Corporation claims that its project team has worked one-on-one with landowners close to the proposed bore. Landowners claim that this is not the case. Will the minister provide a list of the landowners the Water Corporation has worked with? (4) If no to (3), why not? (5) Will the minister table the detailed hydrogeological modelling environmental assessment the Water Corporation claims to exist to prove that the bore will not have any negative effect on the environment? (6) If no to (5), why not? Hon KIM CHANCE replied: I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(b) a list of those people it was sent to; and (c) the dates the letter was written and sent?
(c) the dates the letter was written and sent?
(3) The Water Corporation claims that its project team has worked one-on-one with landowners close to the proposed bore. Landowners claim that this is not the case. Will the minister provide a list of the landowners the Water Corporation has worked with? (4) If no to (3), why not? (5) Will the minister table the detailed hydrogeological modelling environmental assessment the Water Corporation claims to exist to prove that the bore will not have any negative effect on the environment? (6) If no to (5), why not? Hon KIM CHANCE replied: I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(4) If no to (3), why not? (5) Will the minister table the detailed hydrogeological modelling environmental assessment the Water Corporation claims to exist to prove that the bore will not have any negative effect on the environment? (6) If no to (5), why not? Hon KIM CHANCE replied: I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(5) Will the minister table the detailed hydrogeological modelling environmental assessment the Water Corporation claims to exist to prove that the bore will not have any negative effect on the environment? (6) If no to (5), why not? Hon KIM CHANCE replied: I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(6) If no to (5), why not? Hon KIM CHANCE replied: I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
Hon KIM CHANCE replied: I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
I thank Hon Paul Llewellyn for providing some notice of this question. This is complicated, and I have a very involved answer. I table the answer and the attachments marked 1a and 1b, and seek leave for the answer, but not the attachments, to be incorporated into Hansard . Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
Leave granted. [See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
[See paper 2921.] The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
The following material was incorporated - I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
I thank the Hon. Member for some notice of this question. I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
I thank the Hon Member for some notice of this question. The Minister for Water Resources has provided the following response. The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
The proposed bore is for 0.6 GL/year not 1.5 GL. (1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(1) (a) I seek leave to table attachment 1a. (b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(b) The letter was sent to all landowners in the Nelson district of Nannup. This mailing area and addresses (both attached) were suggested and provided by the Shire of Nannup. (c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(c) The letter was sent on 12 April 2007. (2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(2) Not applicable. (3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(3) The Project team has met or spoken with the following: · Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· Gilbert Webster; Lot 3637 on P136279 · James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· James & Tracey Longbottom; Lot 71 · Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· Tom Longbottom; Lot 8268 on P201619 · Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· Bee Winfield; Lot 8269 on P201619 · Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· Anne & Bill Stallard; Lot 11728 on P153857 · Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· Rob & Robyn Buckley; Lot 1 on D63553 · Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· Steve Ucich; Lot 11092 on P203132 · VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
· VM Cartledge; PO Box 172 Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
Further one-to-one consultation will follow as planning for a piperoute from the proposed bore to Millstream Dam continues. (4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(4) Not applicable. (5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(5) Detailed hydrological reports and environmental assessments are in progress and will be made available publicly when complete. (6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
(6) The report is being prepared for the Water Corporation by Consultants and is not yet available.
Explore WA Government Data
Search the full archive in the free dashboard, or query programmatically via API.
Explore more
Government Gazette
Appointments, regulatory notices, planning changes.
Hansard
Debates, questions, speeches and sentiment.
Tabled Papers
Reports and documents tabled in Parliament.
Committees
Committee profiles and recent reports.
Regulations
Subsidiary legislation with filters and summaries.
Bills
Proposed laws and parliamentary progress.
Acts
Current WA legislation and summaries.
Explanatory Memoranda
Bills with EMs (text/PDF) available.
Members
MP profiles, party breakdown and rankings.
Pollie Rankings
Data-driven rankings across 19 categories.
Amendment Chains
Track how schemes and regulations evolve over time.