Mr Murray asks about the due diligence process for the South West Agri Food Precinct, including the consultant, terms, timeline, and cost. The Minister provides detailed answers, outlining the scope and specifics of the due diligence study.

AnsweredQoN 4751Legislative Assembly
Asked
15 March 2011
Portfolio
Agriculture and Food

QuestionView source ↗

I refer to the due diligence process for the South West Agri Food Precinct, and the recent announcement that a consultant has been employed to undertake the task, and I ask:
(a) who is the consultant;
(b) what are the terms of reference;
(c) how long will the process take; and
(d) what is the cost of undertaking the due diligence process?

AnswerView source ↗

Answered
5 April 2011
Responded by
Minister for Agriculture and Food
Response time
21 days
(a)  Cardno (WA) Pty Ltd; ABN 77 009 119 000
2 Bagot Road Subiaco WA 6008 Australia
(b)
SPECIFICATION
Scope
The Technical Due Diligence will review, analyse and summarise information about the physical characteristics of the proposed SWAPP property in order to provide an informed assessment of the risks (ie fatal flaws) associated with the development. Input from specialist consultants will be required, and this will be compiled into a report which will provide recommendations re the key issues and suitability of the site.
The Technical Due Diligence study will analyse the preferred site in terms of four broad areas:
· Physical constraint;
· Regulatory - zoning;
· Environmental and Social;
· Government Policy.
1. Physical
(a) Tenure and Land Survey
a. Title ownership
b. Land tenure
c. Any potential heritage issues
d. Verify land parcels, precinct boundary, easements, rights of way, covenants, current zoning and other legal issues.
(b) Physical Characteristics
a. Topography, soil and slope stability, drainage and flood hazards.
b. Landscape and natural assets
c. Adjoining land uses
d. Site contamination
(c) Infrastructure and Utilities
a. Water, sewer, electricity, gas, telephone, internet service
b. Proximity to and availability of wastewater treatment facilities
c. Transport - existing availability and capacity
2. Regulatory
(a) Existing Approvals
a. Town planning - site plan approvals, building permits, local  government
b. Environmental - storm water, stream and wetlands, water licences,
c. Mine closure plan
(b) Town Planning
a. Identify, timeframes and recommendations regarding rezoning process
b. Outline key requirements of the rezoning proposal
c. Provide a table of the necessary actions, listing studies required, anticipated costs and timeframes for required for project  completion
d. Outline key approvals application(s)
3. Environmental
(a) Land Use and availability
a. Identify environmental impacts at the Doral site based on the list of industries provided and the codes of practice that apply to those  industries.
b. Recommend an appropriate location and area (ha) within the Doral site for the industry core
(b) Residential Amenity
c. Identify industry separation distances from sensitive land uses
d. Identify prevailing wind patterns and trends
e. Identify anticipated odour, dust and noise impacts and modelling requirements and potential social impacts
f. Outline anticipated transport and traffic impacts and movement.
(c) Risk Management
a. Determine societal risk, ie emergency
b. Identify biosecurity issues
(d) Water and Nutrient management
Summarise:
a. Geomorphology and soils
b. Surface and groundwater hydrology
c. Existing water quality
d. Wastewater (including stormwater) treatment and disposal options
4. Government Policy
(a) Review the proposed 'South Burekup' Special Industrial Estate in the draft 'South West Industrial Region Land Strategy' (to be provided by the SWDC) and its associated site assessment criteria in relation to  the Doral site, compare and identify key issues and differences.
(b) Identify key state, regional and local policy's relating to strategic industrial land development
5. Consultation with Key Agency Stakeholders
a) Meet with relevant personnel from each key agency in the South West region including Department of Planning, Department of Environment  and Conservation, Department of Water, Department of Transport,  Main Roads WA and Shire of Dardanup, and any others as requested,  to gain input and direction on the due diligence and any "fatal flaws".
6. Conclusion
(a) Include a summary table of key issues
(b) Recommendation as to the suitability of the site for proposed agrifood industries
(c) Identify further investigations required
(c)  6 weeks
(d)  $29,761
Notice: This document is created or edited using unregistered or evaluation copy of rtLib valid for testing or development purposes only. To use it for productive or any other purposes please register it. You may purchase the license on
http://www.rtlib.com

Explore WA Government Data

Search the full archive in the free dashboard, or query programmatically via API.

Explore more