awarded
🏥 Fremantle Hospital Q Block boiler replacement detailed design
Summary
Fremantle Hospital boiler replacement design contract awarded to Steens Gray & Kelly for $123,640 via Limited Sourcing.
Tender description
To provide detailed design with specification for the boiler to be installed, as well as any works required. Design and documentation of the new procured modular steam boilers to replace Boilers within the Q Block plant room Design and documentation of all systems to integrate the new boiler plant into the existing site infrastructure. Documentation of the Scope of Works for gas supply modifications, RO water feeds and electrical supplies to support the new boiler plant.
Money trail and award details
The South Metropolitan Health Service awarded a $123,640 fixed-price contract via Limited Sourcing to Steens Gray & Kelly (The Steens Gray & Kelly Unit Trust). Only one submission was received.
Steens Gray & Kelly (The Steens Gray & Kelly Unit Trust)
Tender-writer timing and rebid signals
Buyer and contract contacts
Direct phone/email fields remain limited to official contact details already shown on the source record.
Record details
Related tender records
awarded · Award/source date: 11 June 2026
Supply of Surgical Power Tools and Optional Post?Warranty Service and Maintenance for Rockingham Hospital
Rockingham Hospital secured $411k in surgical power tools and maintenance from DeSoutter Medical via an emergency purchase by South Metropol
awarded · Award/source date: 9 June 2026
Provision of Internal Audit Services to SMHS
SMHS awarded a $2.31M internal audit contract to Scyne Advisory Pty Ltd via CUA, for independent assurance and advice.
awarded · Award/source date: 8 June 2026
Installation of 2 Boilers at Peel Health Campus
Installation of 2 Boilers at Peel Health Campus
awarded · Award/source date: 1 May 2020
Refurbishment of 33 Moss St, East Fremantle
SMHS awarded Kardan Construction a $105,351 contract for WC and shower refurbishments at 33 Moss St, East Fremantle, using a panel procureme