HomeTenders WADTMI422925

awarded

🚢 Navigation simulations for Westport shipping channel width assessment - Part 2

DTMI422925Urgency: high
Award/source date
10 March 2026
Seen
19 September 2026
Closing
12 January 2026 · 12 Jan, 2026
Agency
Department of Transport and Major Infrastructure
Estimated arrangement value
$437,492
Method
Direct Sourcing
Regions
Perth Metropolitan

Summary

WA DoT awarded Fremantle Maritime Simulation Centre a $437k direct-sourced contract for Westport shipping channel navigation simulations.

Tender description

Westport Project Office (Westport) are seeking to complete a study to determine the optimum width of the Westport navigation channel (Westport Channel). The Westport Channel refers to the channel that will connect Cockburn Sound with deep water offshore of Perth that is suitable for the transit of large container ships of 14,000 or 18,000 TEU capacity. As part of the preliminary engineering and business case development for the Westport Project, a channel design has been developed (see Attachment 1) that has options for 14,000 or 18,000 TEU design vessel. The document outlines the requirements for real-time navigation simulations to support the assessment of the channel dimensions required to support safe and efficient operation of the Westport terminal, as well as all of the other commercial and recreational boating traffic in the Fremantle Ports area of operation. Westport has specified the following objectives for this study: Determination of the minimum shipping channel width that is acceptable for all key stakeholders: Westport, Fremantle Port Authority, Fremantle Pilots. Validation of a ship simulation model for future simulations that the Westport program may require. Test effectiveness of navigational control measures, identified as part of the earlier Navigational Risk Assessment, with ship simulations. The outcomes of these tests will be used into more detailed risk assessments and to identify operational control measures.

Money trail and award details

This record appears to be a panel, common-use arrangement or standing offer. Its value is shown as an estimated arrangement value, not ordinary spend to one supplier.

Estimated arrangement value
$437,492
Award date
10 March 2026
Submissions
1
Contract term
One Off

The Department of Transport and Major Infrastructure awarded an estimated $437,492 contract via Direct Sourcing to Fremantle Maritime Simulation Centre. There was one submission.

Fremantle Maritime Simulation Centre

Procurement policy signals

Exception reason
C5.2 - Integrate with an existing contract, project or operating environment and no suitable alternative
Limited/exempted procurement
Yes
Limited sourcing justification
C5.2 - Integrate with an existing contract, project or operating environment and no suitable alternative
limited_or_exempted_procurement

Record details

External ID
139814
Department of Transport and Major Infrastructure
Marine navigational or communication services - (100%)
maritime_infrastructureport_expansionnavigation_safetytransport_planningrisk_management