awarded
🚆 Byford Rail Extension - Stage 2
Summary
WA's Public Transport Authority awarded a $9.1M contract to MGC Solutions for Byford Rail Extension Stage 2 signalling and communications.
Tender description
The Byford Rail Extension Stage 2 (BRE2) Project is a vital element of the Byford Rail Extension (BRE), itself a key part of the broader METRONET initiative. BRE have delivered new signalling and communications infrastructure to enable urban, electrified rail services to operate to the new Byford station. These works will extends the signalling and communication infrastructure between Byford (Chainage 37.900km) and Mundijong (Chainage 44.510km), enabling regional rail services and the removal of life expired signalling equipment that exists on this section of the railway and extend the Digital Radio Network to the boundary connection between the regional and urban rail networks.. These works will be managed by the PTA Project Delivery (PPD) and extends across two operational jurisdictions: PTA Territory: CH 37.897km to CH 42.100km ARC Territory: CH 42.100km to CH 44.510km. This project is time-critical to ensure that the recommencement of regional rail services is not delayed. The outcomes and requirements are clearly articulated in these Request for Tender documents, and a briefing will be held to ensure that Respondents understand the Public Transport Authority’s requirements. The Contractor shall supply, construct, install, test, commission, and hand over (including Entry Into Service and Final Asset Acceptance) all required works for the Main Cable Route (MCR) from Byford Station to Mundijong Communications Equipment Room (CER). The works are structured into three separable portions. Separable Portions are as follows. I. Separable Portion 1: Works up to CH 42.200km SP1 is the installation of the MCR and all associated cabling works up to chainage 42.200km. It includes all required interface works with the following infrastructure components: Byford Signalling Equipment Room (SER) Byford Station Main Communication Room (SMCR) Track Side Equipment Room (TSER) A371 ACR397 (Mundijong North Radio Site) II. Separable Portion 2: TSER A416 SP2 is the installation of TSER A416 (Free Issued by PTA), including all necessary works to make the infrastructure operational within PTA Territory, up to chainage 42.200km. III. Separable Portion 3: From Ch 42.200km to Mundijong CER SP3 is the installation of the MCR and all associated cabling works from chainage 42.200 to chainage 44.510. It also includes all required interface works with the following infrastructure components: Mundijong Signalling Equipment Rooms (SER1 & SER2) Mundijong CER For more details, refer to Book 4 Scope of Works and Specification of the Request (including the various attachments provide therewith)
Money trail and award details
This record appears to be a panel, common-use arrangement or standing offer. Its value is shown as an estimated arrangement value, not ordinary spend to one supplier.
The Public Transport Authority awarded an estimated $9,109,621 contract via Open Advertisement to MGC Solutions Pty Ltd (Signals Infrastructure Services Pty Ltd). Six submissions were received.
MGC Solutions Pty Ltd (Signals Infrastructure Services Pty Ltd)
Tender-writer timing and rebid signals
Procurement policy signals
Buyer and contract contacts
Direct phone/email fields remain limited to official contact details already shown on the source record.
Record details
Related tender records
Current · Award/source date: 1 September 2026
PTA260049
Transwa seeks a contractor to supply food and beverages for the Prospector train service, focusing on fresh, quality options to improve pass
awarded · Award/source date: 9 June 2026
E-Scooter Racks at Select PTA Stations
PTA directly sourced Kardan Construction for $151,275 to install 6 e-scooter racks at 5 Perth stations, citing a proprietary exemption.
awarded · Award/source date: 8 June 2026
Environmental Compliance and Technical Advisory Services
PTA awarded a $220k environmental consultancy contract via Limited Sourcing to EnForce Industries for compliance and technical advice.
awarded · Award/source date: 8 June 2026
Power BI and Business Objects Reporting Improvement and Technical Analysis Services
PTA awarded Leaders IT Services a contract for Power BI and Business Objects reporting to improve operational, financial, and asset manageme